Discusses Insp Rept 50-270/73-17 on 731127-30.Noncompliance Noted Re Trecator Bldg Spray Valves Improper Check List Log Entry & Reactor Protective Sys Pressure/Temp Setpoints
ML19322A840
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/28/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A841 List:
References
NUDOCS 7911270597
Download: ML19322A840 (3)


See also: IR 05000270/1973017

Text

-.

.

.-

- ..

-

. . . . - . .

- . - -

-

--_

.9

'

.

,

,

("

UNITED STATES

o

ATOMIC ENERGY COMMISSION

5

\\ e' " q*

'

DIRECTORATE OF REGULATCRY CPERATICUS

l (_ g'(f g

f

aEoioN n - suit a os

~ *

230 P E AC MT R E E ST R E ET. NOR T M* EST

t'4 r e g O' g

,

eg

AT L A N f A. GEoRCa A 30303

,

In Reply Refer To:

DEC 2 81973

RO:II:FJ

50-270/73-17

!

Duke Power Company

'

'

Attn:

Mr. A. C. Thies

Senior Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina 28201

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this office on

November 27-30, 1973, and December 3-7, 1973, of activities authorized by

AEC Operating License No. DPR-47 for the Oconee 2 facility, and to the

3 i

discussion of our findings held by Mr. F. Jape with Messrs. J. E. Smith

,

I

ite conclusion of the inspection.

and J. W. Hampton at

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representativa records, inter-

views with personnel, and observations by the inspector.

The results of our inspection of your corrective action on previously

identified violations are discussed in Section II of the summary of the

enclosed report.

The status of unresolved items identified in previous inspection reports

..

is discussed in Section IV of the summary of the enclosed report.

,N

During the inspection it was found that certain activities under your

license appear to be in violation of AEC requirements. The violations

and references to pertinent requirements are listed in Section I of

g

the summary of the enclosed reprt.

.

.,

f

-

,a

791127057 7 2

_.

.

-

=- --

_ - - -

_

_ _---- ------

_

,

,

Duke Pow;r Company

-2-

DEC 2 8 973

,

,

i

No response is required .for violations listed under I. A.1. a.,b. (1) and

f

c, since these matters were resolved and corrective actions verified during

the inspection.

i

Your response to Item I. A. 2 has been requested a' our notice of violation

letter, 50-269/73-13, sent to you on December 26, 1973.

No additional

response is requested by this letter.

i

i

With regard to violations listed under I. A.1. b. (2), b. (3) and d. ,

Section 2.201 of the AEC's " Rules of Practice," Part 2, Title 10, Code

i

of Federal Regulations, requires that you submit within 20 days, in

writing, your comments concerning these items, a description of any

steps that have been or will be taken to correct these items, a descrip-

tion of any steps that have been or will be taken to prevent recurrence,

>

l

and the date the corrective actions or preventive measure were or will be

completed.

-

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

-.I

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, at written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

You should note that this letter and your reply to this letter will be

disclosed to the public by being placed in an AEC Public Document Room.

Very truly yours,

f

' g>ync2s

.

Norman C. Moseley

Director

Enclosure:

As stated

.

-

~

1

4

. . - _ .

_

- . . - .

- - .

N'

A

j

.

=

.

-

--

-

.

.

-

. -

!

.

.

.

O

. ,etter to Duke Power Company from N. C. Moseley

'

eatea

50-270/73-17

occ 2 81973

DISTRIBUTION

i

H.-D. Thornburg

4

l

RO: HRS (4)

Directorate of Licensing (4)

DR Central Filess