ML19322A732

From kanterella
Jump to navigation Jump to search
Forwards Testing & Startup Insp Repts 50-269/72-03 & 50-270/72-02 on 720321-24.No Noncompliance Noted
ML19322A732
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/12/1972
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James Keppler
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19322A733 List:
References
NUDOCS 7911210765
Download: ML19322A732 (2)


See also: IR 05000269/1972003

Text

'

.

.

4;

-

e

'

' ' *e

UNITED STATES

[

't

ATOMIC ENERGY COMMISSION

m

2hMEbtVGCCCEUGABGt

l *1

e 4

l*

1

AEGION 11 - SulT E 818

y

,

r,

230 P E ACHT R E E ST REET, NORT HWEST

Tatsenons: 14 04 s2 s.4 9 0s

Id

AT L. A NT A. GE ORGI A 30303

DIRECTORATE OF REGULATOEY OPERATIONS

May 12,1972

J. G. Keppler, Chief, Reactor Testing and Operations Branch

Directorate of Regulatory Operations, Headquarters

DUKE F0WER COMPANY (OCONEE 1 AND 2), LICENSE NOS. CPFR-33 AND 3h, DOCKET

NOS. 50-269 A'iD 270

The attached report of an unannounced inspection at the subject site on

March 21-2h ,1972, is forwarded for information.

No items of noncom-

pliance and no safety ite=s were identified.

uO e appears to be more receptive to the inspector's cenments in correcting

specifically-identified preoperational testing deficiencies.

It appears

that a better job is being done in assuring that FSAR design commitments

are demonstrated during testing.

It has not been demenstrated, however,

that effective changes are being made to the basic test program to assure

that the preoperational testing progrca vill accomplish all of the desired

objectives. Continued attentien vill be given to this area in future

inspections.

During this inspection, the principal inspector was advised that Westinghouse

DB-50 circuit breakers are not used at Oconee (RT&O3 h8).

The regional office was recently notified by Duke that they presently

estimate that all steam generator and reactor vessel internals repairs and

modifications vill be completed for Unit 1 on October 1, 1972, and on Unit

2 en October 31, 1972.

O

'

N. C. Moseley

R0:II:NCM

Senior Reactor Inspector

Enclosure:

R0 Rpt. Nos. 50-269/72-3 and

50-270/72-2 (Murphy)