ML19322A699

From kanterella
Jump to navigation Jump to search
Forwards Testing & Startup Insp Rept 50-269/71-09 on 711012-15 & 1103.Noncompliance Noted Re Adequacy of QA Program
ML19322A699
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/11/1972
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James Keppler
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19322A700 List:
References
NUDOCS 7911210741
Download: ML19322A699 (1)


See also: IR 05000269/1971009

Text

.

.

'

4

%

UNITED STATES

[

't.

ATOMIC ENERGY COMMISSION

I ej

l*

l

DIVISION OF COMPl. LANCE

REGION ll - $UIT E 818

230 P E ACHT RE E ST RE ET NORT HWEST

YgLgewongs (404)526 4803

AT LANT A. GEORGI A 30303

February 11, 1972

J. G. Keppler, Chief, Reactor Teating and Operations Branch

Division of Compliance, Headquarters

DUKE POWER COMPANY (OCONEE 1), LICENSE NO. CPPR-33, DOCKET NO. 50-269

The attached report of inspections of the subject facility on October 12-15

and November 3, 1971, is forwarded for information. Three items of non-

compliance with Appendix B of 10 CFR 50 were- identified.

On November 3, 1971, Messrs. Murphy and Moseley met with Messrs. Lee and

Thies, both Vice Presidents of Duke. During the meeting, we reviewed the

recent history of inspection findings to point up a need for more attention

to the quality assurance program. We obtained assurances that both =en

vould look into their phases of the project and take action where needed.

N. C. Moseley

CO:II:NCM

Senior Reactor Inspector

Enclosure:

~

C0 Rpt. No. 50-269/71-9

(Murphy)

cc w/ encl:

E. G. Case, DRS (3)

R. S. Boyd, DRL (2)

R. C. DeYoung, DRL (2)

D. J. Skovholt, DRL (3)

H. R. Denton, DRL (2)

L. Kornblith, Jr., C0

R. H. Engelken, C0

J. B. Henderson, C0

J. P. O'Reilly, C0:I

B. H. Grier, CO:III

J. W. Flora, CO:IV

R. W. Smith, CO:V

C0 Files

DR Central ?i'.ae -

7911210 N [ p

1

>

L

2