ML19322A699
| ML19322A699 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/11/1972 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James Keppler US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19322A700 | List: |
| References | |
| NUDOCS 7911210741 | |
| Download: ML19322A699 (1) | |
See also: IR 05000269/1971009
Text
.
.
'
4
%
UNITED STATES
[
't.
ATOMIC ENERGY COMMISSION
I ej
l*
l
DIVISION OF COMPl. LANCE
REGION ll - $UIT E 818
230 P E ACHT RE E ST RE ET NORT HWEST
YgLgewongs (404)526 4803
AT LANT A. GEORGI A 30303
February 11, 1972
J. G. Keppler, Chief, Reactor Teating and Operations Branch
Division of Compliance, Headquarters
DUKE POWER COMPANY (OCONEE 1), LICENSE NO. CPPR-33, DOCKET NO. 50-269
The attached report of inspections of the subject facility on October 12-15
and November 3, 1971, is forwarded for information. Three items of non-
compliance with Appendix B of 10 CFR 50 were- identified.
On November 3, 1971, Messrs. Murphy and Moseley met with Messrs. Lee and
Thies, both Vice Presidents of Duke. During the meeting, we reviewed the
recent history of inspection findings to point up a need for more attention
to the quality assurance program. We obtained assurances that both =en
vould look into their phases of the project and take action where needed.
N. C. Moseley
CO:II:NCM
Senior Reactor Inspector
Enclosure:
~
C0 Rpt. No. 50-269/71-9
(Murphy)
cc w/ encl:
E. G. Case, DRS (3)
R. S. Boyd, DRL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DRL (3)
H. R. Denton, DRL (2)
L. Kornblith, Jr., C0
R. H. Engelken, C0
J. B. Henderson, C0
J. P. O'Reilly, C0:I
B. H. Grier, CO:III
J. W. Flora, CO:IV
R. W. Smith, CO:V
C0 Files
DR Central ?i'.ae -
7911210 N [ p
1
>
L
2