ML19322A665
| ML19322A665 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/10/1972 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James Keppler US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19322A666 | List: |
| References | |
| NUDOCS 7911210723 | |
| Download: ML19322A665 (1) | |
See also: IR 05000269/1972005
Text
,e
l-
.
,
'
UNITED STATES
.
C
f.
h
ATOMIC ENERGY COMMISSION
DIVISloN OF COMPLE ANCE
.
REGION It - Su?' E Sie
[ \\/4rts 9 [g
/
a,%
230 P E AC Mf R EE ST R E ET, NCRT H mEST
'
,
AT L ANT A, oEORCI A 30303
'
April 10, 1972
.
J. G.'Keppler, Chief, Reactor Testing and Operati.;ns Branch (2)
Division of Compliance, Headquarters
.
CO INQUIRY REPORT NO. 50-269/72-5
DUKE POWER COSC3ANY (OCONEE 1), LICENSE No. CPPR-33, rO XET NO.
50-269, FAILURE OF 7ALVE INTERNALS
The subject inquiry report is forwarded for your information.
We
believe that the licensee's actions in this matter vill be satis-
factorily ec=pleted.
We expect this action to encompass Units 2
and 3.
At this time, this seems to be simply a misapplication in
usage of this particular type of valve. The specification of this
valve for this service was made by Duke. The manufacturer of the
valve is Crane-Chapesn.
M
/
N. C. Moseley
CO:II:NCM
Senior Reactor Inspector
Enclosure:
CO Inquiry Rpt. No.
50-269/72-5 (MurIhy)
cc v/ encl:
E. G. Case, DRS (3)
R. S. Boyd, DEL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DRL (3)
H. R. Denton, DEL (2)
L. Kornblith, Jr., CO
R. H. Engelken, CO
-
-
"
.
J. B. Hendersen, CO
CO Files
-
-
__ DR Central Files
1 sin sie 72 3s
_