Discusses Deficiencies Noted in B&W QA Program & Statements Not Conforming to Fsar.Errors Noted in Specimen Heat Treatment Data & Radiograph Film Densities for Welds Joining Recirculation Nozzle to Shell Outside Limits
ML19322A620
Person / Time
Site: Oconee 
Issue date: 06/03/1971
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A606 List:
References
NUDOCS 7911210692
Download: ML19322A620 (2)


Text

'

C

)

[fh[Y.O

/

h r: zo rATzs ATOM.C :.CRGY COMMISSION

. W'lD.

ow._sou or coueumec gW y c/ fe[

REGION 84 = $U4TE $18 230 PE ACHTREE STR EET, N CA T M w E ST T

a $2H537 Q '. J AT LANT A. GEORGI A 30303 1

,g[

June 3, 1971 Duke Power Company Atta:

Mr. A. C. Thies, Vice President Production and Operation

?r<er Building h22 South Church Street

'ar13tte, North Carolina 28201 M ntletet.:

... Letter relates to the discu=sion Mr. R. 2. Oller of the Division of

cplir.nce, Region III office held with Mr. W. C. Buskey of the Eatecek and

'.iilecx Ccapany and Mr. C. A. Robinson of your staff at the conclusion of

e pressure vessel inspection cecducted on April 1, 1971, regsrding the construction activitie.s t.uthorized by AEC Construction Permit No. CPPR-35 for the Oconee No. 3 faa. ity.

As noted during the discussion, appcrent deficiencies were identified in-volving items not in conformance with a statement in the Final Safety j Analysis Report. The items are as follows:

The Final Safety Analysis Report, Volume 1, Section h.1.3, " Codes and Classifications," paragraph h.1.3.1, " Vessels," states - part, "The design, fabrication, inspection and testing of the reactor ve< & sad closure head,

. is in accordance with the AS'4E Boiler and Press.:J

essel Code,Section III, for Class A vessels."

1.

Paragraph IX-226(A), ASM2 Section III, requires that the manufacturer shall maintain a system of material centrol adequate to assure identity of all material used and that it is acceptable to the applicable speci-fication, prior to the start of =anufacturing operations.

Centrary to this requirement, errors and emissions were found in the specimen heat treatment data reported by the forging supplier, Klockner-Verke, A.G., for the reactor vessel, closure head flanges and icver torus rint,. 'Chere was no indication that the heat treatment data had been reviewed for acceptability by B&W, Mt. Vernon, personnel, i

I l

i

' /

  • [

r.

p Y911210 h 2 l

1 h

L

?

i Duke Power Co=pany June 3, 1971 2.

Pr.rngraph IX-333(3), AS:.C Sectica III, sets out the require =ents for the location of penetrc=eters when the dansity of a radiog-eph fi1=,

c. cross a veld, variec = ore thaa minus 15 or plus 30 par:e.t. The fil:

density for the velda joining the racirculation noznle to the shell vere found to rance frc= a 1cv of 2.0 to a ' igh of 4.0 across the witc n

of the veld. Additional penetrnneter vare not used as required by the coda.

";he abcve conconfot-.ances indict.te tht ?b"'s G ;r:gren. u: 1 plenente c, is c)pn.nntly it.nicqve c to..:ure e G are c.? to c:ds 1:2.u; re su n, r.1 ta, \\;:::

hst n..
orials ed cc..pcssat:2
  • c lch24 L/ t.:eir subcuppli2rs, conf:r;; tr.

all rt: ects to the p_rchasa docu=ent:.

E 2.s e revido us, vi-Qi.. ~;,C d:y:,, via ; yc.r comner.ts Ocac:rning these items

'1 ex/ steps vnich have tean or vill 'Je taken to correct them, Lnd to mini-

.M.

s tec;.rrences. icur r5 ply cr.cr.1

gha:1.::c, ir. particular, a:r/ charges 4.a.ve been er vill te Icf.e to y:t qua'ity nasurance progras.

..dd you have te queseions <:::.eemns the =a,ters discus.:sd in this.etter, yon c y ec r.unicat a di. ectly vith te.i:; cffice.

. t:C.

u r, JC.n G. ravis C3:II:7JL/VLB

irceter x

J. B. Hendersen, CO:HQ (h:

A. Giambusso, CO:HQ L. Kornblith, Jr., CO:HQ R. H. Engelken, CO:HQ F. J. Iong, O:II V. L. Brevnlee, CO:II R. E. 01'.2r, CO :III P

3

(

I l