ML19322A592
| ML19322A592 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/26/1973 |
| From: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Thies A DUKE POWER CO. |
| References | |
| NUDOCS 7911210671 | |
| Download: ML19322A592 (1) | |
Text
__
-- 2~2rg a et F R "
0 Q
UNITED STATES
- D' s
ATOMIC ENERGY COMMISSION h1 9 l
l *l WASHINGTON, D.C.
20545
%,'OJ/
Ilsggg sk Docket No. 50-269 JUL 2 61973 Duke Power Company ATIN:
Mr. Austin C. Thies
{
Senior Vice President Production & Transmission 422 South Church Street P. O. Box 2178 Charlotte, N. C.
28201 Centlemen:
We have completed our review of your report " Analysis of Effects 1
Resulting From Postulated Piping Breaks Outside Containment for l
Oconee Nuclear Station, Units 1, 2 & 3" dated April the supplement to this report dated June 25, 1973 and 22, 1973.
We find the report acceptable with regard to your analysis of postulated ruptures of high-energy piping external to the reactor building and your proposed station modifications for taking corrective action where warranted.
This letter is to confirm our understanding that all Unit 1 modifications will be complete by November 1, 1973 and that those interim measures described in Section 4.1 of the above report will remain in effect until the station modifications are complete.
,1&Ajgt.7 R. C. DeYoung, Assistant Director for Pressurized Water Reactors Directorate of Licensing
{
cc:
Mr. William L. Porter Duke Power Company P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28201 asuno67/