c'l
.S0.-445/78-16 i>
'50-446/78-16 Appendix A
. NOTICE OF DEVIATION Based on results of the-inspection conducted by the NRC Resident Inspector between October 4 and October 11, 1978, it appears that certain of your activities deviate from commitments made in your Final Safety Analysis Report -(FSAR) as indicated below:
A.
FSAR Section lA(B), on page lA(B)-5, states that installation and testing of mechanical _-(Cadweld) splices in reinforcing bars in the containment structure will co.aply with Regulatory Guide 1.10.
Para-graph C.1 of Regulatory Guide 1.10 requires that each member of the splicing crew be qualified by making qualification splices.. hen W
crew members work as a unit, the crew may be qualified as a unit.
Contrary to the above:
It was established, based on interviews with cognizant craft and TUGC0 quality assurance personnel, that craft personnel who have not been given qualification tests have made Cadweld splices independently of the qualified splicer up to the point of loading and firing the filler metal crucible.
Such personnel are not identified in appropriate quality assurance records relatable to any given splice, day or crew composition.
This is a deviation.