WM
1
g&
% ,o
E
4
UNITED STATES
NUCLEAR HEGULATORY COMMISSION
,,g_
_.
.o
REGION IV
- 5 . ..k
.j
G11 HYAN PLAZA DRIVE. SUITE 1000
c
ARLINGTON, TEXAS 7G011
.Q
f
.
% ', , , . #
November 17, 1978
i
In. Reply Refer To:
RIV.
Docket No. 50-445/Rpt. 78-16
50-446/Rpt. 78-16
Texas Utilities Generating Company
ATTN: Mr. R. J. Gary, Executive
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection activities perfonned by our Resident
Inspector, Mr. R. G. Taylor, during the period October 2-31, 1978,
of activities authorized by NRC Construction Permit Nos. CPPR-126
and 127 for the Comanche Peak facility, Units No.1 and 2, and to
the discussion of our findings with Mr. R. G. Tolson and other mem-
bers of your staff during the inspection period.
Areas examined during the inspection and our findings are discussed
in the enclosed inspection report. Within these areas, the inspection
consisted of selective ' examination of procedures and representative
records, interviews with personnel, and observations by the inspector-
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 of
the NRC Regulations, " Quality Assurance Criteria for Nuclear Power
Plants."
The Notice of Violation for the item of noncompliance reported in para-
graph 4 of the enclosed inspection report was forwarded to you by our
letter dated October 12, 1978; therefore, this letter does not require
further response regarding this matter.
During the inspection, it was found that certain of your activities
appeared to deviate from commitments in the FSAR. This item and ref-
erences to the specific commitments are identified in the enclosed
i
7901040AT?
- -
.
,
Texas Utilitites Generating
Company
-2-
November 17, 1978
Notice of. Deviation. Please provide us within 30 days, in writing,
your comments concerning this item, a description of any steps that
have been or will be taken to correct it, a description of any steps
- that have been or will be taken to prevent recurrence, and the date
all corrective actions or preventive measures were or will be completed.
.
We have also examined actions you have taken with regard to previously
identified inspection findings. .The status of these items is identified
in paragraph 2 of the enclosed report.
0ne new unresolved item is identified in paragraph 6 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is ' contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room. .If we do not hear from you in
this regard within the specified period, the report will be placed in
-the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
[R
,;
c
W..C. SeOle, Chief.
Reactor Cdnstruction and
Engineering Support Branch
Enclosures:
1.
Appendix 'A, Notice of Deviation
2. . IE Inspection Report No. 50-445/78-16-
50-446/78-16
cc: w/ enclosures
L
LTexas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
- 2001. Bryan Tower
!
. Dallas, Texas
75201-