ML19321B234

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-361/80-08 & 50-362/80-05 on 800407-0502.No Noncompliance Noted
ML19321B234
Person / Time
Site: San Onofre  
Issue date: 07/03/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML19321B235 List:
References
NUDOCS 8007300313
Download: ML19321B234 (2)


See also: IR 05000361/1980008

Text

TJ(

s-

cun

.

q(o

UNITED STATES

g

,i

NUCLEAR REGULATORY COMMISSION

c.

$,

E

REGION V

c

e[

1990 N. CALIFORNIA DOULEVARD

ob

SulTE 202, WALNUT CREEK PLAZA

g

e...*

WALNUT CRE E K. CAllFORNIA 94596

JUL 3

1980

Docket Nos. 50-361

50-362

Southern California Edison Company

P.O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay

Vice President, Advanced Engineering

Gentlemen:

Subject: NRC Inspection at San Onofre Units 2 and 3

This refers to the inspections conducted by Mr. R. J. Pate of this

office during the period April 7 to May 2,1980 of activities authorized

by NRC Construction Permit Nos. CPPR-97 and 98, and to the discussions

of his findings held with Mr. D. E. Nunn and other members of your

staff on April 11, 25 and May 2, 1980.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector. No

items of noncompliance with NRC requirements were identified within

the scope of this inspection.

'

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title .10 Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that

you believe to be proprietary, it is necessary that you submit a

written application to this office, within 20 days of the date of this

letter, requesting that such information be withheld from public

disclosure. The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The

application should be prepared so that any proprietary information

identified is contained in an enclosure to the application since the

application without the enclosure will also be placed in the Public

~

80073003/,3

D

..

-

- -

. -

..

-

,_

,g.

4

'

Dr. L. T. Papay-

-2-

JUL 3

1980

Document Room.

If we do not hear from you in this regard within the

specified period, the. report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/80-08

50-362/80-05

cc w/o enclosure:

R. Dietch, Vice President

Nuclear Engineering & Operations, SCE

..

.