Suggested Tech Spec Changes for Administrative Controls
ML19321A725
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/11/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19321A724 List:
References
NUDOCS 8007240116
Download: ML19321A725 (5)


Text

- - 4-11-80 O

ADMINISTRATIVE CONTROLS 6.9.1.2 The startup report shall address each of the tests identified in the FSAR and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. ' Any additional specific details requested in license conditions based on other commitments shall be included in this report.

6.9.1.3 Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, ' Aichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation), supplementary reports shall be submitted at least every three months until all three events have been completed.

ANNUALREPORTN!

6.9.1.4 Annual reports covering the activities of the unit as described below for the previous calendar year shall be submitted prior to March 1 of each year. The initial report shall be submitted prior to March 1 of the year following initial criticality.

6.9.1.5 Reports required on an annual basis shall include:

a. A tabulation on an annual basis of the number of station, utility, and other personnel (including contractors) receiving exposures greater than 100 arem/yr and their associated man rem exposure according to work and job functions,2/ e.g. , reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe maintenance), waste processing, and refueling.

The dose assignments to various duty functions may be estimated based on pocket dosimeter, TLD, or film badge measurements. Small exposures totalling less than 20 percent of tr.e individual total dose need not be accounted for. In the aggregate, at least 80 percent of the total whole body dose received from external sources should be assigned to specific major work functions. .

-'/ A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station.

2/

, This tabulation supplements the requirements of $20.407 of 10 CFR Part 20.

NORTH ANNA - UNIT 2 6-15 8007240//I.

' 11 00 ADMINISTRATIVE CONTROLS

b. The complete results of the steam generator tube inservice inspections performed during the report period (Reference Specification 4.4.5.5.b.).
c. SEE ATTACMED PME -

MONTHLY OPERATING REPORT -

6.9.1.6 Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Director, Office of Ma.,agement and Program Analysis, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a copy to the Regional Office, of Inspection and Enforcement, no later than the 15th of each month following the calendar month covered by the report.

REPORTABLE OCCURRENCES 6.9.1.7 The REPORTABLE OCCURRENCES of Specifications 6.9.1.8 and 6.9.1.9 below, including corrective actions and measures to prevent recurrence, shall be reported to the NRC. Supplemental reports may be required to fully describe final resolution of occurrence. In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be made to the

- original report date.

PROMPT NOTIFICATION WITH WRITTEN FOLLOWUP 6.9.1.8 The types of events listed below shall be reported within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone and confirmed by telegraph, mailgram, or facsimile transmission to the Director of the Regional Office, or his designate, no later than the first I working day following the event, with a written followup report within 14 days. The written followup report shall include, as a minimum, a completed copy of a licensee event report form. Information provided on the licensee event report form shall be supplemented, as needed, by additional narrative material to provide complete explanation of the circumstances surrounding the i event.  !

l

a. Failure of the reactor protection system or other systems subject to  ;

limiting safety-system settings to initiate the required protective j function by the ' time a monitored parameter reaches the setpoint  !

specified as the limiting safety systa setting in the technical -

specifications or failure to complete the required protective function.

NORTH ANNA - UNIT 2 6-16 l l

l l

T-

c. A report documenting challenges to pressurizer safety and relief valves, and summarizing failures of pressurizer safety and relief valves shall be prepared annually and submitted by each April 1.

The report will include all such incidents that have occurred during the previous calendar year. The first report will cover the time period April 1, 1980 through December 31, 1980. Subsequent reports will cover the entire calendar year.

t e

' 11 30 ADMINISTRATIVE CONTROLS

b. Operation of the unit or affected systems when any parameter or operation subject to a limiting condition for operation is less conservative than the least conservative aspect of the limiting condition for operation established in the technical specifications.
c. Abnormal degradation discovered in fuel cladding, reactor coofant pressure boundary, or primary containment.
d. Reactivity anomalies involving disagreement with the predicted value of reactivity balance under steady-state conditions during power
  • operation greater than or equal to 1% delta k/k; a calculated reactivity balance indicating a shutdown margin less conservative than specified in the technical specifications; short-term reactivity increases that correspond to a reactor period of less than 5 seconds or, if subcritical, an unplanned reactivity insertion of more than 0.5%

delta k/k; or occurrence of any unplanned criticality,

e. Failure or malfunction of one or more components which prevents or could prevent, by itself, the fulfillment of the functional requirements of system (s) used to cope with accidents analyzed in the SAR.
f. Personnel errur = p credural inadequacy which prevents or could prevent, by itself, the fulfillment of the functional requirements of systems required to cope with accidents analyzed in the SAR.
g. Conditions arising from natural or man made events that, as a direct result of the event, require plant shutdown, operation of safety evstems, or other protective measures required by technical specifications.
h. Errers discovered in the transient or accident analyses or in the methods used for such analyses as described in the safety analysis report or in the bases for the technical specifications that have or could have permitted reactor ccaration in a manner less conservative than assumed in the analyses.

i.

Performance of structures, systems, or components that requires remedial action or corrective measures to prevent operation in a manner less conservative than that assumed in the accideat analyses in the safety analysis report or technical specifications bases; or discovery during plant life of conditions not specifically considered in the safety analysis report or technical specifications that require remedial action or corrective measures to prevent the existence or development of an unsafe condition.

j SEE ATTAC6D PME l NORTH ANNA - UNIT 2 6-17 i

J. Failures of pressurizer safety and relief valves to close as intended, i

.