RO 50-219/80-27-1P:on 800716,reactor Bldg to Suppression Chamber Vacuum Breaker Sys Inlet Pipe Was Found Blocked by Plastic Bag.Caused by Personnel Error.Plastic Bag Was Removed from Vacuum Breaker Inlet Opening
ML19321A540
Person / Time
Site: Oyster Creek
Issue date: 07/17/1980
From: Crosby P
JERSEY CENTRAL POWER & LIGHT CO.
To:
Shared Package
ML19321A538 List:
References
NUDOCS 8007230574
Download: ML19321A540 (2)


Text

.

a e

~ O'

\\a Date of Initial Telephone Occurrence:

July 16,1980 Report Date:

Time of Initial' Written Report Date:

July 17, 1980 Occurrence:

2330

' OYSTER CREEK NUCLEAR GENERATING STATION FORKED RIVER, NEW JERSEY 08731 Reportable Occurrence Report No. 50-219/80-27-1P Violation of the Technical Specifications, paragraph 3.5.A.4.a.

IDENTIFICATION when the Reactor Building to Suppression Chamber vacuum breaker OF OCCURRENCE:

system inlet pipe was found to be blocked by a plastic bag.

This event is considered to be a reportable occurrence as defined in the Technical Specifications, paragraph 6.9.2.a.(6)

CONDITIONS PRIOR The plant conditions during the time period involved varied TO OCCURRENCE:

between cold shutdown and steady state power operation at 100 MWe output following a refueling outage. The following data is provided for the steady state power operation experienced during this time.

Power:

Reactor 300 MWe Electrical 100 MWe 4

Flow:

Recirculation 5.2 x 10 gpm Feedwater 8 x 105 lb/hr Pressure 1000 psig g

Stack Gas 6.46 x 103 pci/sec DESCRIPTION On Wednesday, July 16, 1980 at approximately 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> 0F OCCURRENCE:

during a tour by plant management and NRC personnel, the reactor-building to suppression chamber vacuum breaker inlet pipe was found to be covered by a plastic bag. The plastic bag had apparently been in place since June 7,1980 while performing the Primary Containment Integrated Leak Rate Test.

t

/

i

- 80072305"f#/

.,,o Reportable ' Occurrence :

Page 2 Report No. 50-219/80-27-lP APPARENT CAUSE D? sign Procedure OF: OCCURRENCE:

_ Manufacture

. Unusual Service Condition Installation /

Inc. Environmental Construction Component Failure X

Operator Other (Specify)

The cause of the occurrence can be attributed to personn,el error. The plastic bag had been placed over the pipe by the Technical Group engineers to check for leakage past the vacuum breakers _during the performance of the Primary Containment Integrated Leak Rate Test. The personnel

-per orm ng the test failed to remove the plastic when the f

i testing was complete.

i ANALYSIS OF_

The vacuum relief system from the reactor building to the OCCURRENCE:

suppression chamber consists of two 100". vacuum relief breaker subsystems (two (2) parallel sets of two (2) valves in series).

These two sets of vacuum relief valves share a common header which is open to the reactor building atmosphere. The purpose I

of the vacuum relief valves is to equalize the pressure between the reactor building and suppression chamber so that containment external design. pressure -limits are not exceeded. Operation of either subsystem will maintain the suppression chamber external pressure less than one half of its design pressure.

The possibility exists that the plastic covering the pipe may have prevented the vacuum relief system from preventing the pressure from approaching or exceeding the external design pressure of the primary containment.

CORRECTIVE _

Immediate corrective action was to remove the plastic covering ACTION:

the vacuum breaker inlet opening.

FAILURE DATA:

Not applicable l Y Date:

o.4 L7,198D

. Prepared by:

PaulJ.grosby.