ML19321A284
| ML19321A284 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/12/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19321A285 | List: |
| References | |
| NUDOCS 8007230130 | |
| Download: ML19321A284 (2) | |
See also: IR 05000289/1980011
Text
_.
-.
,__
-.
._
_ __
Y
}
's
.
4
(*NITED STATES
4
4
g
"*g
NUCLEAR REGULATORY COMMisslON
,
REClON I
j
,j
s
e
431 PARK AVENUE
[
KING OF PRUS$l A, PENN5Yt.V ANI A 19404
- n
JUN 121980
Docket No. 50-289
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold
Senior Vice President
100 Interpace rarkway
Parsippany, New Jersey 07054
Gentlemen:
Subject:
Inspection No. 50-289/80-11
This refers to the inspection conducted by Mr. G. Napuda of this office on April
28 - May 2, 1980 at Three Mile Island Nuclear Power Station, Unit 1, Middletown,
Pennsylvania, and your Parsippany, New Jersey, Corporate Offices, of activities
i
authorized by NRC License No. DPR-50 and to the discussions.of our findings held
by Mr. Napuda with Messrs. N. Kazanas and G. Troffer and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of th~is inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an' affidavit executed by the owner of the information, which
,
.
identifies the document o part sought to be withheld, and which contains a
,
statement of reasons which addresses with specificity the items which will be
r,
considered by the Comission as listed in subparagrap (b) (4) of Section
2.790. The infonnation sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
,
8o o'r 23WJ1
-.
.
-
-
--
-- -- ..
..
.
.
.
I
Metropolitan Edison Company
2
'
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
,
'
El o
runner, Chief
Rea tor Operations and Nuclear
Su port Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-289/80-11
cc w/ enc 1:
J. G. Herbein, Vice President-Nuclear Operations
R. J. Toole, Manager, Unit 1
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Colitz, Manager, Plant Engineering, Unit 1
L. W. Harding, Supervisor of Licensing
R. F. Wilson, Director - Technical Functions
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.
-
R. W. Conrad
J. B. Lieberman, Esquire
,
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment
(Without Report)
G. F. Trowbridge, Esquire
_
,,-,_ _
_
_
_ _ _
_