ML19321A245

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-358/80-13 on 800513,14 & 23 & Notice of Violation
ML19321A245
Person / Time
Site: Zimmer
Issue date: 06/12/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML19321A246 List:
References
NUDOCS 8007230072
Download: ML19321A245 (2)


See also: IR 05000358/1980013

Text

.

s

.

    • " To ,

UNITED STATES

r

g

  • g

NUCLEAR REGULATORY COMMISSION

i

(

3

REGloN 811

f

799 ROOSEVELT RO AD

3

U

CLEN ELLYN, ILLINOIS 60137

JUN 12 G80.

Docket No. 50-358

Cincinnati Gas and Electric

Company

ATTN:

Mr. Earl A. Borgmann

Vice President

Engineering Services and

Electric Production

139 East 4th Street

Cincinnati, OH 45201

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this office

on May 13, 14, and 23, 1980, of activities at the William H. Zimmer Power

Station authorized by NRC Construction Permit No. CPPR-88 and to the dis-

cussion of our findings with Mr. W. W. Schwiers and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews_with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance:

(1) corrective action

!

taken and the results achieved; (2) corrective action to be taken to avoid

further noncocpliance; and (3) the date when full compliance will be achieved.

i

- In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of thic letter, the en-

.

I

closures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If'the enclosures contain in-

formation that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure. The

application mast include a full statement of the reasons for which the

information is considered proprietary, and should be prepared so that

proprietary information identified in the application is contained in an

j

enclosure tc the application.

8007230072

,

. _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

N 12 m

Cincinnati Gas and Electric

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

A M N;,h g3 h 2 w

-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

l

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Report

No. 50-358/80-13

cc w/encls:

Mr. J. R. Schott, Plant

,

Superintendent

l

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Yahn, Power Siting

Commission

Citizens Against a Radioactive

Environment

Helen W. Evans, State of Ohio

.

._~

.