Forwards IE Insp Rept 50-317/80-07 on 800429-0501.No Noncompliance Noted
ML19321A000
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 06/04/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19321A001 List:
References
NUDOCS 8007220278
Download: ML19321A000 (2)


See also: IR 05000317/1980007

Text

7%

-

-

8

UNITED STATES

c

l

NUCLEAR REGULATORY COMMisslON

fj

}

^,}

REGION i

.

W

g

631 PARK AVENUE

.[

KING OF PRUS$1 A, PENNSYLV ANI A 19406

DR 0 4 Un

Docket No. 50-317

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Investigation No. 50-317/80-07

This refers to the investigation conducted by Mr. J. P. Durr of this office on

April 29-May 1,1980 at Calvert Cliffs Nuclear Power Plant, Lusby, Maryland of

activities authorized by NRC License No. DPR-53 and to the discussions of our

findings held by Mr. Durr with Mr. L. Russell of your staff at the conclusion of

the investigation and to a subsequent telephone discussion between Messrs. L.

Russell, J. Syndor and J. Durr on May 5-6, 1980.

Areas examined during this investigation are described in the Office of Investi-

gation and Enforcement Investigation Report which is enclosed with this letter.

Within these areas, the investigation consisted of selective examinations of

procedures and representative records, interviews with personnel, and observati.ons

by the investigator.

Within the scope of this investigation no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed investigation

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

0007220 A

.

.

Baltimore Gas and Electric Company

2

.No reply to this letter is required; however, should you have any questions

concerning this investigation, we will be pleased to discuss them with you.

Sincerely,

=

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Investigation and Enforcement Investigation

Report Number S0-317/80-07

1

cc w/ enc 1:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

T. Sydnor, General Supervisor, Operations QA

,

R. C. L. Olson, Senior Engineer

K. ti. Sebra, Principal Engineer

l

i

4

,

-

, - - .

,

.,