Forwards IE Info Notice 80-26, Evaluation of Contractor QA Programs. No Written Response Required
ML19320D792
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 06/10/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
References
NUDOCS 8007220222
Download: ML19320D792 (1)


Text

f CEr fjG' c

UNITED STATES

'* 0 8

NUCLEAR REGULATORY COMMISSION n

3 E

REGION til o,,

f 799 ROOSEVELT r.OAD b

o GLEN ELLYN, ILLINOIS 60137 JUN 101980 Docket No. 50-483 Docket No. 50-486 Union Electric Company ATTN:

Mr. John K. Bryan Vice President - Nuclear P. O. Box 149 St. Louis, MO 63166 Gentlemen:

This Information Notice is being forwarded to you for informetion.

No written response to this information notice is required.

If you have any questions related to the subject, please contact this office.

Sincerely,

[<

) mes G. Keppler Director

Enclosure:

IE Information Notice No. 80-26 cc w/ encl:

Mr. W. H. Weber, Manager, Nuclear Construction Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Region I & IV Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission i

l 8007220 211 Q

4 e

5 UNITED STATES SSINS No.:

6835 NUCLEAR REGULATORY COMMISSION Accession No.:

OFFICE OF INSPECTION AND ENFORCEMENT 8005050064 WASHINGTON, D.C.

20555 m-gq n

June 10, 1980 g

g IE Information Notice No. 80-26 To All Part 50 Licensees EVALUATION OF CONTRACTOR QA PROGRAMS Description of Circumstances:

Appendix B to 10 CFR 50 requires that each applicant and licensee establish and execute a Qual.. Assurance Program, and that each licensee "shall require contractors or su' ca.. tractors to provide a quality assurance program".

Further Appendix B requires each applicant and licensee to regularly review the status and adequacy of subcontractor programs.

The NRC is becoming increasingly concerned by continuing evidence that many holders of construction permits and operating licenses are not properly implementing these facets of their quality assurance programs.

Examples of this lack of effectiveness of contractor QA program implementation, and inadequacy of licensee overview of contractor QA program implementation are appearing in every facet of project activity.

Instances have been observed where kr-hitect engineers have released documents ft. procurement with inapproprLte material specifications.

Nuclear steam system suppliers have overlooked erroneous assumptions in analysis of instrument system response to design basis transients.

Other cases have been observed where both AE's and NSSS have not followed through on commitments to review vendor detailed designs.

Vene.rs' quality assurance programs have been found to contain errors of both ' mission and commission.

A containment tendon installation contract was awarded '.) a specialty contractor.

During a licensee audit some three months after work started it appeared that a contractor inspector was falsifying records by initialing inspection points not actually observed.

A subsequent investigation by the licensee revealed that the contractor had required that QC inspections be performed only on a random basic even though all records had QC signatures.

The signatures could mean that the activity was inspected or that record signoffs by others were reviewed; or that the data were recorded by the QC inspector.

It is apparent that the licensee had not appropriately reviewed the contractor's inspection program prior to the start of work.

In another instance, after completion and acceptance of a major structural steel installation, the licensee found that significant rework would be required to correct construction quality problems.

NRC inspection at the contractors fabrication facility disclosed that in addition to work for that licensee, the contractor.;ad contracts for "high density" fuel storage racks from several operati.1g licensees.

None of the NRC licensees had inspected the contractor's shop or examined his quality assurance programs.

Response to Informatiot Notice No. 80-26 is not required.

The NRC expects appropriate action from 'll licensees and organizations engaged in nuclear activities and actions wiil be examined in the ongoing NRC inspection program.

i IE Information Notice No. 80-26 Enclosure June 10, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 80-25 Transportation of 5/30/80 Material Licensee in Pyrophoric Uranium Priority / Categories II-A, II-D, III-I and IV-DI; Agreement State Licensees in equivalent categories 80-24 Low Level Radioactive 5/30/80 All NRC and Agreement Waste Burial Criteria State Licensees 80-23 Loss of Suction to 5/29/80 All power reactor to Emergency facilities with an OL or CP 80-22 Breakdown In Contamination 5/28/80 All power reactor Control Programs OLs and near term cps 80-21 Anchorage and Support of 5/16/80 All power reactor Safety-Related Electrical facilities with an Equipment OL or CP 80-20 Loss of Decay Heat Removal 5/8/80 All light water reactor Capability at Davis-Besse facilities holding Unit 1 While in a Refueling power reactor OLs or cps Mode 80-19 NIOSH Recall of Recircu-5/6/80 All holders of a power lating-Mode (Closed-Circuit) reactor OL, Resedrch Self-Contained Breathing Reactor License, Fuel Apparatus (Rebreathers)

Cycle Facility License and Priority I Material License 80-18 Possible Weapons Smuggling 5/5/80 All power reactor Pouch facilities with an OL, fuel fabrication and processing facilities and Materials Priority I licensees (processors and distributors) 80-17 Potential Hazards Associated 5/5/80 All radiography With Interchangable Parts Licenses On Radiographic Equipment 1