ML19320D701

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-26, Evaluation of Contractor QA Programs. No Written Response Required
ML19320D701
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/10/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8007220094
Download: ML19320D701 (1)


Text

bcc to DKC W CENTRAL FILES

,[spreade,%

UNITED STATES PDR:HQ d'

NUCLEAR REGULATORY COMMISSION LPOR 8 '*.g

  1. '(
  1. g I !

REGloN IV 3 hj {. 7 -)j j ARLINGTON, TEXAS 76012 NEIC e

611 RYAN Pt.AZA oRIVE, SUITE 1000 f

June 10, 1980 STATE 4 %

Docket Nos.

50-313 50-368 Arkansas Power and Light Company ATTN:

Mr. William Cavanaugh III Tice President of Generation and Construction P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

Ihis IE Inforsation Notics is being forwarded to you for infor=ation. No written response to this information notice is required.

If you have any questions related to the subject, please contact this office.

Sincerely,

^

s A

4-Karl V. {eyfric Director

Enclosures:

1.

IE Information Notice No. 80-26 2.

List of Recently Issued IE Information Notices cc:

James P. O'Hanlon, Plant Manager Arkansas Nuclear One j

P. O. Box 608 l

Russellville, Arkansas 72801 l

800722087[

t UNITED STATES SSINS No.:

6835 NUCLEAR REGULATORY COMMISSION Accession No.:

OFFICE OF INSPECTION AND ENFORCEMENT 8005050064 WASHINGTON, D.C.

20555

'D'

<Dg"'{

u Elrd ha ua

a IE Information Notice No. 80-26 To All Part 50 Licensees Date: June 10, 1980 Page 1 of 2 EVALUATION OF CONTRACTOR QA PR0 GRAMS Description of Circumstances:

Appendix B to 10 CFR 50 requires that each applicant and licensee establish and execute a Quality Assurance Program, and that each licensee "shall require contractors or subcontractors to provide a quality assurance program."

Further, Appendix B requires each applicant and licensee to regularly review the status and adequacy of subcontractor programs.

The NRC is becoming increasingly concerned by continuing evidence that many holders of construction permits and operating licenses are not properly implementing these facets of their quality assurance programs. Examples of this lack of effectiveness of contractor QA program implementation, and inadequacy of licensee overview of contractor QA program implementation are appearing in every facet of project activity.

Instances have been observed where architect-engineers (AE) have released documents for procurement with inappropriate material specifications. Nuclear steam system suppliers (NSSS) have overlooked erroneous assumptions in analysis of instrument system response oo design basis transients.

Other cases have been observed where both AEs and NSSS have not followed through on commitments to review vendor detailed designs.

Vendors quality assurance programs have been found to contain 1

errors of both omission and commission.

A r.ontainment tendon installation contract was awarded to a specialty contractor.

During a licensee audit some three months after work started, it appeared that a contractor inspector was falsifying records by initialing inspection points not actually observed.

A subsequent investigation by the licensee revealed that the contractor had required that QC inspections be performed only on a random basis even though all' records had QC signatures. The signatures could mean that the activity was inspected or that record signoffs by others were reviewed; or that the data were recorded by the QC inspector.

It is apparent that the licensee had not appropriately' reviewed the contractor's inspection program prior to the start of work.

In another-instance, after completion and acceptance of a major structural steel installation,_the licensee found that significant rework would be required to correct construction quality problems.

NRC inspection at the contractor's fabrication facility disclosed that in a'ddition to work for that licensee, the contractor had contracts for "high density" fuel storage racks 4

4

~e,

IE Information Notice No. 80-26 To All Part 50 Licensees Date: June 10, 1980 Page 2 of 2 from se.'eral operating licensees. None of the NRC licensees had inspected the contractor's shop or examined his quality assurance programs.

Response to Information Notice No. 80-26 is not required.

The NRC expects appropriate action from all licensees and orgsnizations engaged in nuclear activities and actions will be examined in the ongoing NRC inspection program.

t 1

9

m

+-

IE Information Notice No. 80-26 June 10, 1980 LISTING OF RECENTLY ISSUED lE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 80-20 Loss of Decay Heat Removal 5/8/80 All light water reactor Capability at Davis-Besse facilities holding Unit 1 While in a Refueling power reactor Operating Mode Licenses (OLs) or Construction Permits (cps) 80-21 Anchorage and Support of 5/16/80 All power reactor Safety-Related Electrical facilities with an Equipment Operating License (OL) or Construction Permit (CP) 80-22 Breakdown In Contamination 5/28/80 All power reactor Control Programs Operating Licenses (OLs) and near term Construction Permits (cps) 80-23 Loss of Suction 5/29/80 All power reactor to Emergency Feedwater facilities with an Pumps Operating License (OL) or Construction Permit (CP) 80-24 Low Level Radioactive 5/30/80 All NRC and Agreement Waste Burial Criteria State Licensees 80-25 Transportation of 5/30/80 Material Licensee Pyrophoric Uranium in Priority / Categories II-A, II-D, III-I and IV-DI; Agreement State Licensees in equivalent categories Enclosure