ML19320D317
| ML19320D317 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 06/04/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19320D318 | List: |
| References | |
| NUDOCS 8007210241 | |
| Download: ML19320D317 (2) | |
See also: IR 05000317/1980005
Text
.5
.
g
UNITED STATES
i
p FEg}o
NUCLEAR REGULATORY COMMIS510N
[
REGION I
o
$'
$
601 PARK AVENUE
V
f
KING OF PRUS$l A. PENNSYLV ANf A 19406
3DN
4 1980
+
u..
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATE
Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
.
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection Nos. 50-317/80-05; 50-318/80-05
This refers to the inspection conducted by Mr. R. Architzel of this off. ice on
April 7-30,1980 at the Calvert Cliffs Nuclear Power Plant, Lusby, Maryland of
activities authorized by NRC License Nos. DPR-53 and DPR-69 and to the discussions
of our findings held by Mr. Architzel with Mr. L. Russell of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompliance brought to your attention in letters dated October 17,1979 (Item
A)andMarch 11, 1980 (Item B).
We have no further questions regarding your
action at this time.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
. 30 o 7 a r.odtLr
'
.
.-
.
. Baltimore Gas and Electric Company
2
JUN
4 1980
.
, No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
_ ,. _
-
1
J. Brunnsr, Chief
Re
tor Operations and Nuclear
upport Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report No. 50-317/80-05 and 50-318/80-05-
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
T. Sydnor, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer
. - . .
-- ,,
,
4
e, , - -
-.
a