ML19320D313

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-65,revising Tech Spec Door Numbers in Table 3.9-1 & Position of Certain Doors in Auxiliary Bldg During Fuel Movement in Spent Fuel Area or Crane Operation Over Spent Fuel Pool
ML19320D313
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/10/1980
From: Counsil W, Fee W
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19320D314 List:
References
B10032, TAC-7424, NUDOCS 8007210238
Download: ML19320D313 (3)


Text

?

o > IP. NOIMIEA!ir Iml.mES

.. . ~ Nabo*n'o#. CONNECTICUT 06101 5 ~n~.~

...~, ..~,7. . . _;p.;,

L L  ;  :. . :::'".%lC%

July 10, 1980 uocket No. 50-336 B10032 Director of Nuclear Reactor Regulation Attn: Mr. Robert A. Clark, Chief Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

(1) W. G. Counsil letter to R. A. Clark dated May 9, 1980.

Gentlemen:

Millstona Nuclear Power Station, Unit No. 2 Proposed Revisions to Technical Specifications Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby proposes to amend its operating license, DPR-65, by incorporating the changes identified in Attachment 1 into the Millstone Unit No. 2 Technical Specifications.

The change proposes to revise the door numbers listed in Table 3.9-1 and the position of certain doors in the Auxiliary Building during fuel movement within the spent fuel storage area or crane operation with loads over the spent fuel storage pool.

The door numbers listed in Table 3.9-1 have been revised as a result of security modifications implemented at Millstone Unit No. 2, and the Technical Specifications are proposed to be clarified accordingly.

The revised positions of the noted Auxiliary Building doors will provide access to the container storage area and the solidification system area during fuel movement within the spent fuel storage area or during crane operation with loads over the spent fuel storage pool. Integrity of the areas for which the EBFS serves as an engineered safety feature is not compromised as a result of this proposal.

The above proposed changes have been reviewed pursuant to 10CFR50.59 and have not been found to constitute an unreviewed safety question. The basis for this is thac the above-proposed changes do not decrease the ability of the Enclocure Building Filtration System to perform its design function for the spent fuel pool area.

ao0721.o;139,

F g

  • The Millstone Unit No. 2 Nuclear Review Board has reviewed and approved the above-proposed changes and concurred in the above determination.

NNECO has reviewed the proposed license amendment pursuant to the requirements

. of 10CFR170 and has determined that this Class III change can be incorporated into the Cycle 4 reload effort. As such, the appropriate amendment fee has been forwarded in Reference (1).

We trust you find this information sufficient to concur with the proposed license amendment.

Very truly yours, NORTilEAST NUCLEAR ENERGY COMPAhT r

  • W. GVCounsil Senior Vice President By:

W. F. Fee Executive Vice President Attachment

- I

STATE OF CONNECTICUT )

) ss. Berlin /0# /9/o COUNTY OF HARTFORD )

Then personally appeared before me W. G. Counsil, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file -

I the foregoing information in the name and on behalf of the Licensees herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

> ) k. Y Notary Public My Commission Expires March 31,1981

.. :