Forwards IE Insp Repts 50-352/80-03 & 50-353/80-03 on 800225-0325 & Notice of Violation
ML19320D298
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/26/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19320D291 List:
References
NUDOCS 8007210221
Download: ML19320D298 (2)


See also: IR 05000352/1980003

Text

?7

' ' .

e

e

UNITED STATES

psogDo

NUCLEAR REGULATORY COMMisslON

8

REGION I

o

$

$

$31 PARK AVENUE

W

f

KING OF PRUSSIA, PENNSYLVANIA 19406

(D \\ *****/

MM 2 0 E0

Docket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection 50-352/80-03 and 50-353/80-03

This refers to the inspection conducted by Mr. J. Mattia of this office on

February 25 - March 25, 1980, at the Limerick Generating Station, Units 1 and 2,

Limerick, Pennsylvania, of activities authorized by NRC License Nos. CPPR-106

and CPPR-107 and to the discussions of our findings held by Mr. Mattia with Mr.

Corcoran and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

i

these areas, the inspection consisted of selective examinations of procedures

'

and representative records, interviews with personnel, and ob.arvations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974. This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within thirty (30) days of your receipt of this notice, a written statement or

'

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

'

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

8007210M /

,

.

..

.

.

.

Philadelphia Electric Company

2

that you make a written application within 20 days to this office to withhold

such infonnation from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Consnission-as listed in subparagraph (b) (4) of Section 2.790.

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

7

M

+

-

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-352/80-03 and 50-353/80-03

cc w/encls:

V. S. Boyer, Senior Vice President, Nuclear Power

.