ML19320C921

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required
ML19320C921
Person / Time
Site: University of California - Irvine
Issue date: 06/24/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mcgaugh J
CALIFORNIA, UNIV. OF, IRVINE, CA
References
NUDOCS 8007180266
Download: ML19320C921 (1)


Text

TIC

  1. 8
  • o UNITED STATES

[

NUCLEAR REGULATORY COMMISSION 9,$

REGION V g

1990 N. CALIFORNIA BOULEVARD

%, *,,, *,d' SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 June 24, 1980 Docket No. 50-326

-University of California Department of Chemistry Irvine, California 92717 Atten:

J. L. McGaugh Vice Chancellor Gentlemen:

The enclosed IE Circular No. 80-14 is forwarded to you for information.

If there are any questions related to your uilderstanding of the suggested actions, please contact this office.

Sincerely, tacts IIR.H.

ngelken I

Director

Enclosures:

1.

IE Circular No. 80-14 2.

List of IE Circulars Recently Issued l

l bl l

z a' '

8007180 L

ct SSIris. : 6830 UllITED STATES Accession flo.:

ilVCLEAR REGULATORY COMMISS10tl 8005050074 0FFICE OF IllSPECTI0ri AfID ENFORCEMEllT WASHIrlGT0il, D. C.

20555 June 24, 1980 IE Circular flo. 80-14 RADI0 ACTIVE CONTAMINATION OF PLAflT DEMIrlERALIZED WATER SYSTEM AtlD RESULTA!F INTERNAL C0flTAMINATION OF PERSONNEL This circular describes an event which occurred at a nuclear power facility; however, the generic implications may be applicable to research reactors, and fuel cycle facilities.

On March 17, 1980, a licensee informed the NRC resident inspector that portions of the plant demineralized water (DW) system were found to be radioactively contaminated. A temporary hose used to add demineralized water to the spent fuel pool was the pathway for the cross-contamination.

After this fuel pool makeup was completed on March 14, the temporary DW line (still connected to the DW header) was inadvertently left submerged in the fuel pool.

Since the DW header pressure at the point of supply was relatively low (a DW booster pump had been secured), a siphoning action occurred, resulting in radioactive contamination of portions of the DW header.

On M&rch 17, 1980, while performing routine secondary system chemical analyses, containedhighlevelsofbaronandhadactivityof1.5x10'ghechemistrylab the licensee discovered that the demineralized water tap in uCi/ml (mainly Cs-134, Cs-137, Co-53, Co-60 and Mn-54).

It was subsequently discovered that demineralized water from the chemistry laboratory supply tap had been used to make five (5) pots of coffee. The remaining coffee was confiscated and the twenty-three (23) individuals who had consumed this coffee were whole-body counted.

All involved individuals showed no intake greater than an equivalent 0.01 MPC-HRS. Analysis performed by the licensee's radiation consultant, based on the maximum concentration of radioactivity found in the coffee, indicated that the resultant 50-year dose commitment to an individual drinking eight ounces of this coffee would be less than 1 millirem.

Further licensee investigation revealed that the non-radiological chemistry DW supply tap was the only DW supply point outside the Auxiliary Building controlled area.

This DW supply tap was tagged prohibiting human consumption to prevent a similar event in the future.

It is recommended that you review your facilities use of demineralized water (DW) via temporary connections and give attention to the following:

1.

Provisions should be made to assure that radioactive materials are not inadvertently introduced into your facility's DW system via the improper use of temporary connections. A temporary cross connection between contaminated systems and the DW system without adequate physical controls to prevent cross-contamination should be prohibited.

IE Cirs 'ar No. 30-14 June 24, 1980 Page 2 of 2 2.

In addition to some physical means of preventing backflow into the DW system, appropriate administrative controls should be established to ensure that the DW supply valve is secured and temporary hosing is disconnected from the DW supply header after use.

3.

Use of plant-supplied DW for human consumption should be prohibited.

The potable water system should be the only authorized source of water for human consu"-ption.

4.

Examine potable and demineralized water systems to determine if pathways exist allowing or having the potential to allow contamination of these systems including temporary cc nections whereby siphons could cause n

situations described above.

No written response to this Circular.is required.

Your review of this matter to determine its applicability to your facility and any corrective and preven-tive actions taken or planned, as appropriate, will be reviewed during a subsequent NRC inspection.

If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.

.k IE Circular No. 80-14 Enclosure June 24, 1980 RECEllTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.

Issue 80-13 Grid Strap Damage in -

5/18/80 All holders of Reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of Reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP 80-10 Failure to Maintain 4/29/80 All holders of Reactor Environmental Qualification OLs and cps of Equipment 80-09 Problems _With Plant Internal 4/28/80 All holders of a power Comunications Systems reactor OL or CP 80-08 BWR Technical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWR's holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil System reactor OL or CP 80-06

-Control and Accountability 4/14/80 Medical licensees in Systems for Implant Therapy Categories G and G1 Sources 80-05 Emergency Diesel-Generator 4/1/80 All holders of a power Lubricating 011 Addition and reactor CL or CP Onsite Supply 80-04 Securing of Threaded Locking 3/14/80 All holders of a power l

Devices on Safety-Related reactor OL or CP Equipment.

80-03 Protection from Toxic Gas 3/6/80 All holders of a Hazards power reactor OL 80-02 Nuclear. Power Plant Staff 2/1/80 All holders of Reactor Work Hours OLs, including research and test reactors, and cps i

l 1

l