Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205B8961999-03-25025 March 1999 Forwards Insp Rept 50-326/99-201 on 990223-25.No Violations Noted.Various Aspects of Reactor Operations,Maint, Engineering Programs & Security Were Inspected ML20202A6841999-01-22022 January 1999 Forwards Amend 4 to License R-116 & Safety Evaluation.Amend Provides Surveillance Requirement Applicable to Shutdown Conditions,Air Effluent Release Limits Consistent with Current 10CFR20 & Clarifying,Editorial Changes ML20197J7101998-12-0707 December 1998 Responds to Recent Telcon in Which NRC Requested Clarification of Few Items Re Request for Amend to TS for Univ of Ca,Irvine Triga Reactor ML20151Z2901998-09-17017 September 1998 Forwards RAI Re Changes to Univ of California,Irvine Triga Research Reactor TSs for Surveillances During Shutdown Conditions Submitted on 980824.Response Requested within 60 Days of Date of Ltr ML20217E9371998-03-26026 March 1998 Forwards Insp Rept 50-326/97-201 on 971208-11 of Triga Research Reactor.No Significant Safety Issues Were Identified ML20199L6461997-11-29029 November 1997 Forwards Licensee Rept of Items of TS non-compliance & Facility Annual Rept for 960701-970630 ML20199L6571997-11-29029 November 1997 Informs of Several Violations of TS at Facility.Corrective Actions:Full Insps & Recalibrations Have Been Carried Out & Specific Schedule Established & Posted in Facility Detailing Dates of Required Surveillance Activities Projected ML20100E5021996-02-12012 February 1996 Responds to Violations Noted in License R-116.Corrective Actions:New Channel Instruments Designed to Provide Normally Closed Set of Contacts Initiated by bi-stable,providing Same Scram & Interlock Functions as Equipment ML20094S3951995-11-29029 November 1995 Informs of Omissions Found During Review of Records in Conjunction w/on-site Insp by Region IV Re Implementation of Operator Requalification Plan ML20091L3721995-08-13013 August 1995 Forwards Univ of CA Irvine Nuclear Reactor Facility Annual Rept for Jul 1994 - June 1995. Error Identified in Distribution of Previous Annual Rept.Rept for Jul 1993 - June 1994 Encl.W/O Jul 1993 - June 1994 Rept ML20065L7601994-04-12012 April 1994 Informs That Reactor Operations Committee for Facility Failed to Meet in Period 930624-1217,in Violation of Requirements in TS Section 6.2f Due to Lack of Urgent Business,Heavy Staff Teaching Loads & Busy Schedules ML20035E9651993-03-23023 March 1993 Forwards Insp Rept 50-326/93-01 on 930216-18.No Violations or Deviations Noted.Encls a & B Withheld Ref 10CFR2.790(d) ML20034D4201992-04-21021 April 1992 Confirms Telcon W/G Miller & W Eresian Re Evaluation of Requalification Program & Licensed Personnel Scheduled for 920706-07.Requests Reference Matl for Exam at Least 60 Days Prior to Exam Date ML20058K0841990-11-26026 November 1990 Advises of Changes Re Identity of Individuals in Administration Chain ML20058J0111990-11-0909 November 1990 Ack Receipt of Transmitting Rev 2 to Physical Security Plan & Supplemental Info Re Performance Characteristics of Intrusion Alarm Sys.Changes Acceptable IR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20055G9271990-07-19019 July 1990 Provides Decommissioning Statement for Facility.Revised Estimates Will Be Reported to Commission at Intervals Not to Exceed 5-yrs ML20043H2191990-06-0505 June 1990 Forwards Updated Version of Physical Security Plan.Alarm Reporting Sys Redescribed to Agree W/Changes in Instrumentation Made Over Last 2 Yr Period.W/O Encl ML20012B8621990-03-0202 March 1990 Forwards Safeguards Insp Rept 50-326/90-01 on 900220-21.No Violations Noted ML19354E6331990-01-18018 January 1990 Responds to NRC Re Violations Noted in Insp of License R-116.Corrective Actions:All 13 Required Aspects for Each Licensed Individual Will Be Examined on Single Day & Retraining Performed Until Deficient Item Correct ML20005E1291989-12-22022 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/89-02.Requests That Response to Item C.2 of Notice of Violation Re Failure to Conduct Annual Operating Test Be Revised ML20005G1241989-12-18018 December 1989 Responds to Violations Noted in Exam Rept 50-326/OL-89-01. Corrective Action:Use of Lower Ranges of Linear Channel Will Be Fully Investigated & Mode Switch Electrical Transients Will Be Cleaned & Examined ML20005D6831989-11-28028 November 1989 Forwards Exam Rept 50-326/OL-89-01 of Exam Administered on 891025-26 ML19324B4361989-10-25025 October 1989 Responds to NRC Re Violations Noted in Insp of License R-116.Corrective Actions:Reactor Daily Startup Checklist Modified to Require Reactor Operators to Verify Completion & Signoff of Appropriate Checklists ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 ML19324B4391989-05-0505 May 1989 Informs That Reactor Operations Committee for Univ of California,Irvine Nuclear Reactor Facility Failed to Meet During 880818-890131,in Violation of Tech Specs,Due to Routine Operations Discontinued,Including Staff Reduction ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply IR 05000326/19880011988-04-11011 April 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/88-01.Position Re Calibr of Emergency Air Sampling,Air Flow or Vol Metering Devices Stated in Paragraph C of Reg Guide 8.25 ML20151G4091988-04-0404 April 1988 Responds to NRC Re Violations Noted in Insp Rept 50-326/88-01.Corrective Actions:Review Sheet Being Created to Assure Review of All Checklists During Insps & Reactor Supervisor & Radiation Safety Officer Reviewed Issues ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148B0491988-03-0303 March 1988 Forwards Insp Rept 50-326/88-01 on 880127-29 & Notice of Violation.Expresses Concern That Licensee Not Providing Adequate Level of Mgt Attention to Facility Operations ML20149F4161988-01-12012 January 1988 Forwards Partial Response to NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Including Procurement & Receipt Insp Program & Methods for Choosing Fasteners to Be Tested ML20235L6241987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20215C8981987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Branch Now Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager for Facility ML20207C3761986-12-16016 December 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Items Noted in 861022 Notice of Violation. Corrective Actions Will Be Reviewed During Future Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000326/19860011986-10-22022 October 1986 Forwards Safeguards Insp Repts 50-326/86-01 & 50-326/86-02 on 860910-11 & Notice of Violation.Notice of Violation & Insp Rept Withheld (Ref 10CFR2.790) ML20205P2821986-05-0707 May 1986 Forwards Exam Rept 50-326/OL-86-01 Administered on 860408-09 ML20210H9431986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000326/20090091985-12-13013 December 1985 Discusses Insps on 850326-0909 & Loss of Main & Auxiliary Feedwater Event on 850609 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $900,000 ML20138M9201985-12-13013 December 1985 Forwards Addl Info Re 830623 Response to Generic Ltr 83-08, Mod of Vacuum Breakers on Mark I Containments, Per 851105 Request ML20137B7571985-11-21021 November 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept ML20137B7751985-10-28028 October 1985 Responds to NRC Re Violations Noted in Insp Rept. Corrective Actions:Reactor Operations Committee Established Firm Schedule for Holding Meetings & Senior Reactor Operator Exams Will Be Conducted ML20205E4161985-09-30030 September 1985 Forwards Insp Rept 50-326/85-01 on 850903-06 & Notice of Violation ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20095E9131984-08-20020 August 1984 Ack Receipt of Re Proposed Research Reactor Emergency plan.Sixty-day Extension of Deadline for Response to Questions Raised by NRC Requested ML20197G6711984-06-12012 June 1984 Forwards IE Safeguards Insp Rept 50-326/84-01 on 840319.No Noncompliance Noted ML20081J1571983-10-31031 October 1983 Requests All Interested NRC Branches Be Made Aware of Changes in Mailing Address for Univ.Mail Continues to Be Sent to Old Mailing Address Which Delays Internal Distribution ML20065B4901983-02-0202 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-326/82-04.Corrective Actions:Reactor Operations Committee Met on 821202 & 830107.Future Meetings Will Be Held on Schedule 1999-03-25
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARIR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20012B8621990-03-0202 March 1990 Forwards Safeguards Insp Rept 50-326/90-01 on 900220-21.No Violations Noted ML20005E1291989-12-22022 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/89-02.Requests That Response to Item C.2 of Notice of Violation Re Failure to Conduct Annual Operating Test Be Revised ML20005D6831989-11-28028 November 1989 Forwards Exam Rept 50-326/OL-89-01 of Exam Administered on 891025-26 ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply IR 05000326/19880011988-04-11011 April 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/88-01.Position Re Calibr of Emergency Air Sampling,Air Flow or Vol Metering Devices Stated in Paragraph C of Reg Guide 8.25 ML20148B0491988-03-0303 March 1988 Forwards Insp Rept 50-326/88-01 on 880127-29 & Notice of Violation.Expresses Concern That Licensee Not Providing Adequate Level of Mgt Attention to Facility Operations ML20235L6241987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20215C8981987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Branch Now Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager for Facility ML20207C3761986-12-16016 December 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Items Noted in 861022 Notice of Violation. Corrective Actions Will Be Reviewed During Future Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000326/19860011986-10-22022 October 1986 Forwards Safeguards Insp Repts 50-326/86-01 & 50-326/86-02 on 860910-11 & Notice of Violation.Notice of Violation & Insp Rept Withheld (Ref 10CFR2.790) ML20205P2821986-05-0707 May 1986 Forwards Exam Rept 50-326/OL-86-01 Administered on 860408-09 ML20210H9431986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20137B7571985-11-21021 November 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept ML20205E4161985-09-30030 September 1985 Forwards Insp Rept 50-326/85-01 on 850903-06 & Notice of Violation ML20197G6711984-06-12012 June 1984 Forwards IE Safeguards Insp Rept 50-326/84-01 on 840319.No Noncompliance Noted ML20058C6021982-07-0707 July 1982 Forwards IE Safeguards Insp Rept 50-326/82-02 on 820510-0701 & Notice of Violation ML20054L7931982-07-0202 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20052B2221982-04-15015 April 1982 Forwards IE Insp Rept 50-326/82-01 on 820323-24 & Notice of Violation ML20041B7891982-02-17017 February 1982 Forwards Revision 1 to IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors IR 05000326/19810011981-03-13013 March 1981 Forwards IE Physical Security Insp Rept 50-326/81-01 on 810226-27.No Noncompliance Noted IR 05000326/19810021981-03-11011 March 1981 Forwards IE Insp Rept 50-326/81-02 on 810226.No Noncompliance Noted ML19341C0891981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19341C4361981-01-14014 January 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-02 ML19341C4421980-12-10010 December 1980 Forwards IE Insp Rept 50-326/80-02 on 801029-30 & Notice of Violation ML19339A2131980-09-24024 September 1980 Requests Endorsements & Copy of Amend 7 to Policy E-53 ML19344F1421980-08-12012 August 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-01.NRC Concluded That Licensee Actions Are Not Sufficient to Avoid Further Violations ML19344F1441980-07-0303 July 1980 Forwards IE Insp Rept 50-326/80-01 on 800519-21 & Notice of Violation ML19320C9211980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19296C3431980-02-0101 February 1980 Forwards IE Circular 80-02, Nuclear Power Plant Staff Work Hours. No Written Response Required ML19210D7231979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254E6801979-10-19019 October 1979 Notifies of Commission 790809 Approval to Publish Proposed Amends to 10CFR50 & 70 in Fr,Re Emergency Plans for Nonpower Reactor Licensees.Forwards Transcript of 790827 Meeting Re Impact of Proposed Safeguards Upgrade Rule ML19254E5571979-10-10010 October 1979 Forwards Amend 9 to Indemnity Agreement E-53,modifying in Course of Transportation. Requests Return of One Signed Copy ML19249D4201979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19253C8321979-08-22022 August 1979 Forwards Draft Reg Guide 5.XX, Std Format & Content for Licensee Physical Security Plan for Protection of SNM of Moderate or Low Strategic Significance. W/O Encl IR 05000326/19790041979-08-14014 August 1979 Forwards IE Insp Rept 50-326/79-04 on 790713.No Noncompliance Noted.Insp Rept Withheld (Ref 10CFR2.790) ML19276G9691979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19247B9001979-08-10010 August 1979 Forwards IE Bulletin 79-19, Packaging of Low Level Radioactive Waste for Transport & Burial. Action Required ML19253A5321979-07-30030 July 1979 Forwards 790724 Fr Notice of Amends to 10CFR70 & 73 to Provide Physical Protection Measures to Detect Theft of Snm. All Affected Licensees Must Submit New Physical Security Plans Following Reg Guide 5.XX Format IR 05000326/19790021979-07-26026 July 1979 Discusses IE Insp Rept 50-326/79-02 on 790226.Notice of Violation Withheld (Ref 10CFR2.790) ML19207B6611979-07-19019 July 1979 Forwards IE Insp Rept 50-326/79-05 on 790619-21.No Noncompliance Noted ML19242D5761979-06-29029 June 1979 Forwards IE Insp Rept 50-326/79-03 on 790509-10.No Noncompliance Noted ML19246C1721979-06-22022 June 1979 Forwards IE Info Notice 79-16, Nuclear Incident at Tmi. No Action Required ML19256B3161979-05-18018 May 1979 Forwards IE Circular 79-08, Attempted Extortion - Low Enriched U ML19289F0621979-04-27027 April 1979 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp 1990-07-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20205B8961999-03-25025 March 1999 Forwards Insp Rept 50-326/99-201 on 990223-25.No Violations Noted.Various Aspects of Reactor Operations,Maint, Engineering Programs & Security Were Inspected ML20202A6841999-01-22022 January 1999 Forwards Amend 4 to License R-116 & Safety Evaluation.Amend Provides Surveillance Requirement Applicable to Shutdown Conditions,Air Effluent Release Limits Consistent with Current 10CFR20 & Clarifying,Editorial Changes ML20151Z2901998-09-17017 September 1998 Forwards RAI Re Changes to Univ of California,Irvine Triga Research Reactor TSs for Surveillances During Shutdown Conditions Submitted on 980824.Response Requested within 60 Days of Date of Ltr ML20217E9371998-03-26026 March 1998 Forwards Insp Rept 50-326/97-201 on 971208-11 of Triga Research Reactor.No Significant Safety Issues Were Identified ML20035E9651993-03-23023 March 1993 Forwards Insp Rept 50-326/93-01 on 930216-18.No Violations or Deviations Noted.Encls a & B Withheld Ref 10CFR2.790(d) ML20034D4201992-04-21021 April 1992 Confirms Telcon W/G Miller & W Eresian Re Evaluation of Requalification Program & Licensed Personnel Scheduled for 920706-07.Requests Reference Matl for Exam at Least 60 Days Prior to Exam Date ML20058J0111990-11-0909 November 1990 Ack Receipt of Transmitting Rev 2 to Physical Security Plan & Supplemental Info Re Performance Characteristics of Intrusion Alarm Sys.Changes Acceptable IR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20012B8621990-03-0202 March 1990 Forwards Safeguards Insp Rept 50-326/90-01 on 900220-21.No Violations Noted ML20005E1291989-12-22022 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/89-02.Requests That Response to Item C.2 of Notice of Violation Re Failure to Conduct Annual Operating Test Be Revised ML20005D6831989-11-28028 November 1989 Forwards Exam Rept 50-326/OL-89-01 of Exam Administered on 891025-26 ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply IR 05000326/19880011988-04-11011 April 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/88-01.Position Re Calibr of Emergency Air Sampling,Air Flow or Vol Metering Devices Stated in Paragraph C of Reg Guide 8.25 ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148B0491988-03-0303 March 1988 Forwards Insp Rept 50-326/88-01 on 880127-29 & Notice of Violation.Expresses Concern That Licensee Not Providing Adequate Level of Mgt Attention to Facility Operations ML20235L6241987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20215C8981987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Branch Now Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager for Facility ML20207C3761986-12-16016 December 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Items Noted in 861022 Notice of Violation. Corrective Actions Will Be Reviewed During Future Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000326/19860011986-10-22022 October 1986 Forwards Safeguards Insp Repts 50-326/86-01 & 50-326/86-02 on 860910-11 & Notice of Violation.Notice of Violation & Insp Rept Withheld (Ref 10CFR2.790) ML20205P2821986-05-0707 May 1986 Forwards Exam Rept 50-326/OL-86-01 Administered on 860408-09 ML20210H9431986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000326/20090091985-12-13013 December 1985 Discusses Insps on 850326-0909 & Loss of Main & Auxiliary Feedwater Event on 850609 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $900,000 ML20137B7571985-11-21021 November 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept ML20205E4161985-09-30030 September 1985 Forwards Insp Rept 50-326/85-01 on 850903-06 & Notice of Violation ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20197G6711984-06-12012 June 1984 Forwards IE Safeguards Insp Rept 50-326/84-01 on 840319.No Noncompliance Noted ML20058C6021982-07-0707 July 1982 Forwards IE Safeguards Insp Rept 50-326/82-02 on 820510-0701 & Notice of Violation ML20054L7931982-07-0202 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20052B2221982-04-15015 April 1982 Forwards IE Insp Rept 50-326/82-01 on 820323-24 & Notice of Violation ML20041B7891982-02-17017 February 1982 Forwards Revision 1 to IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors IR 05000326/19810011981-03-13013 March 1981 Forwards IE Physical Security Insp Rept 50-326/81-01 on 810226-27.No Noncompliance Noted IR 05000326/19810021981-03-11011 March 1981 Forwards IE Insp Rept 50-326/81-02 on 810226.No Noncompliance Noted ML19341C0891981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19341C4361981-01-14014 January 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-02 ML19341C4421980-12-10010 December 1980 Forwards IE Insp Rept 50-326/80-02 on 801029-30 & Notice of Violation ML19339A2131980-09-24024 September 1980 Requests Endorsements & Copy of Amend 7 to Policy E-53 ML19344F1421980-08-12012 August 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-01.NRC Concluded That Licensee Actions Are Not Sufficient to Avoid Further Violations ML19344F1441980-07-0303 July 1980 Forwards IE Insp Rept 50-326/80-01 on 800519-21 & Notice of Violation ML19320C9211980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19296C3431980-02-0101 February 1980 Forwards IE Circular 80-02, Nuclear Power Plant Staff Work Hours. No Written Response Required ML19210D7231979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254E6801979-10-19019 October 1979 Notifies of Commission 790809 Approval to Publish Proposed Amends to 10CFR50 & 70 in Fr,Re Emergency Plans for Nonpower Reactor Licensees.Forwards Transcript of 790827 Meeting Re Impact of Proposed Safeguards Upgrade Rule ML19254E5571979-10-10010 October 1979 Forwards Amend 9 to Indemnity Agreement E-53,modifying in Course of Transportation. Requests Return of One Signed Copy ML19249D4201979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text 1999-03-25
[Table view] |
Text
TIC
- 8
[
NUCLEAR REGULATORY COMMISSION 9,$
REGION V g
1990 N. CALIFORNIA BOULEVARD
%, *,,, *,d' SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 June 24, 1980 Docket No. 50-326
-University of California Department of Chemistry Irvine, California 92717 Atten:
J. L. McGaugh Vice Chancellor Gentlemen:
The enclosed IE Circular No. 80-14 is forwarded to you for information.
If there are any questions related to your uilderstanding of the suggested actions, please contact this office.
Sincerely, tacts IIR.H.
ngelken I
Director
Enclosures:
1.
IE Circular No. 80-14 2.
List of IE Circulars Recently Issued l
l bl l
z a' '
8007180 L
ct SSIris. : 6830 UllITED STATES Accession flo.:
ilVCLEAR REGULATORY COMMISS10tl 8005050074 0FFICE OF IllSPECTI0ri AfID ENFORCEMEllT WASHIrlGT0il, D. C.
20555 June 24, 1980 IE Circular flo. 80-14 RADI0 ACTIVE CONTAMINATION OF PLAflT DEMIrlERALIZED WATER SYSTEM AtlD RESULTA!F INTERNAL C0flTAMINATION OF PERSONNEL This circular describes an event which occurred at a nuclear power facility; however, the generic implications may be applicable to research reactors, and fuel cycle facilities.
On March 17, 1980, a licensee informed the NRC resident inspector that portions of the plant demineralized water (DW) system were found to be radioactively contaminated. A temporary hose used to add demineralized water to the spent fuel pool was the pathway for the cross-contamination.
After this fuel pool makeup was completed on March 14, the temporary DW line (still connected to the DW header) was inadvertently left submerged in the fuel pool.
Since the DW header pressure at the point of supply was relatively low (a DW booster pump had been secured), a siphoning action occurred, resulting in radioactive contamination of portions of the DW header.
On M&rch 17, 1980, while performing routine secondary system chemical analyses, containedhighlevelsofbaronandhadactivityof1.5x10'ghechemistrylab the licensee discovered that the demineralized water tap in uCi/ml (mainly Cs-134, Cs-137, Co-53, Co-60 and Mn-54).
It was subsequently discovered that demineralized water from the chemistry laboratory supply tap had been used to make five (5) pots of coffee. The remaining coffee was confiscated and the twenty-three (23) individuals who had consumed this coffee were whole-body counted.
All involved individuals showed no intake greater than an equivalent 0.01 MPC-HRS. Analysis performed by the licensee's radiation consultant, based on the maximum concentration of radioactivity found in the coffee, indicated that the resultant 50-year dose commitment to an individual drinking eight ounces of this coffee would be less than 1 millirem.
Further licensee investigation revealed that the non-radiological chemistry DW supply tap was the only DW supply point outside the Auxiliary Building controlled area.
This DW supply tap was tagged prohibiting human consumption to prevent a similar event in the future.
It is recommended that you review your facilities use of demineralized water (DW) via temporary connections and give attention to the following:
1.
Provisions should be made to assure that radioactive materials are not inadvertently introduced into your facility's DW system via the improper use of temporary connections. A temporary cross connection between contaminated systems and the DW system without adequate physical controls to prevent cross-contamination should be prohibited.
IE Cirs 'ar No. 30-14 June 24, 1980 Page 2 of 2 2.
In addition to some physical means of preventing backflow into the DW system, appropriate administrative controls should be established to ensure that the DW supply valve is secured and temporary hosing is disconnected from the DW supply header after use.
3.
Use of plant-supplied DW for human consumption should be prohibited.
The potable water system should be the only authorized source of water for human consu"-ption.
4.
Examine potable and demineralized water systems to determine if pathways exist allowing or having the potential to allow contamination of these systems including temporary cc nections whereby siphons could cause n
situations described above.
No written response to this Circular.is required.
Your review of this matter to determine its applicability to your facility and any corrective and preven-tive actions taken or planned, as appropriate, will be reviewed during a subsequent NRC inspection.
If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.
.k IE Circular No. 80-14 Enclosure June 24, 1980 RECEllTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.
Issue 80-13 Grid Strap Damage in -
5/18/80 All holders of Reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of Reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP 80-10 Failure to Maintain 4/29/80 All holders of Reactor Environmental Qualification OLs and cps of Equipment 80-09 Problems _With Plant Internal 4/28/80 All holders of a power Comunications Systems reactor OL or CP 80-08 BWR Technical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWR's holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil System reactor OL or CP 80-06
-Control and Accountability 4/14/80 Medical licensees in Systems for Implant Therapy Categories G and G1 Sources 80-05 Emergency Diesel-Generator 4/1/80 All holders of a power Lubricating 011 Addition and reactor CL or CP Onsite Supply 80-04 Securing of Threaded Locking 3/14/80 All holders of a power l
Devices on Safety-Related reactor OL or CP Equipment.
80-03 Protection from Toxic Gas 3/6/80 All holders of a Hazards power reactor OL 80-02 Nuclear. Power Plant Staff 2/1/80 All holders of Reactor Work Hours OLs, including research and test reactors, and cps i
l 1
l