Forwards IE Insp Repts 50-329/80-15 & 50-330/80-16 on 800602-05.No Noncompliance Noted
ML19320C723
Person / Time
Site: Midland
Issue date: 06/30/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19320C724 List:
References
NUDOCS 8007170625
Download: ML19320C723 (2)


See also: IR 05000329/1980015

Text

.

_ _ _

1

-

r

.

,

e

Q'

.

[puto

s

'o,

UNITED STATES

./

j

NUCLEAR RF.GULATORY COMMISSION

i

y

,

e

REGION 111

1

o

8

799 ROOSEVELT ROAD

GLEN ELLYN,ILLINOls 6o137

o

  • ....

GijN 3 0 G80'

Docket No. 50-329

Docket No. 50-330

.

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Messrs. C. M. Erb, K. R. Naidu,

R. N. Sutphin, and T. E. Vandel of this office on June 2-5, 1980, of

activities at the Midland Nuclear Power Plant Construction site authorized

by NRC Construction Permits No. CPPR-81 and No. CPPR-82 and to the discussion

of our findings with Mr. D. B. Miller and others of your staff and others of

the Midland site staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report vill be placed in the NRC's Public Document

Room, except as follows.

If this report contaics information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

800717.o M

Q

._

?

.

k

,

.

Consumers Power Company

-2-

I UN 3 0 $80

J

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

M%

-0

=

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-329/80-15

and No. 50-330/80-16

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Myron M. Cherry, Chicago,

._

_

. . _ . ._

_- -.- -