Forwards IE Insp Rept 50-461/80-09 on 800520-23 & Notice of Violation
ML19320C392
Person / Time
Site: Clinton 
Issue date: 06/11/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML19320C393 List:
References
NUDOCS 8007160751
Download: ML19320C392 (2)


See also: IR 05000461/1980009

Text

r

gn tro

d

%

UNITED STATES

E

"'h,

NUCLEAR REGULATORY COMMISSION

$

,E

REGION ill

a

/[

799 ROOSEVELT ROAD

Q

%

GLEN ELLYN,ILLINolS 6o137

~JUN 1 1 1980

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This re b s to the inspection conducted by Messrs. H. M. Wescott and

E. J. Gallagher of this office on May 20-23, 1980, of activities at

the Clinton Power Station, Unit 1, authorized by NRC Construction

Permit No. CPPR-137 and to the discussion of our findings with

Messrs. L. J. Koch, J. D. Geier, J. F. Hampton, and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed Ap-

pendix A.

The inspection showed that action had been taken to correct

the identified noncompliance and to prevent recurrence.

Consequently,

no reply to this noncompliance is required and we have no further ques-

tions regarding this matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twer.ty days of your receipt of this letter, tu

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

800'16075;

I

. - . .

.

-

-

--.

Illinois Power Company

-2-

We will gladly discuss any questions you have concerning this

. inspection.

Sincerely,

9f((

(, W

Jcm hf

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

'

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Re;. ort

No. 50-461/80-09

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

4

Mr. Dean Hansell, Office of

Assistant Attorney General

4

,- -

-

-,

-

- , -