Text
Sa t tg
.
,
[jjp(
NUCLEAR REGULATORY COMMISSION
<
o,
UNITED STATES
- Q h(I O
y .*
'
j
FIEGION V
l.l
'
q
1990 N. CALIFORNIA BOULEVARD
j
U
% ,,,* o
SulTE 202, WALNUT CREEK PLAZA
V(N
4
WALNUT CREEK, CALIFORNIA 94596
ERY 23 ESO
Docket No. 50-344
-
Portland General Electric Company
121 S. W. Salmon Street
Portland, Oregon 97204
Attention: Mr. Charles Goodwin, Jr.
Assistant Vice President
Gentlemen:
Subject: NRC Inspection - Trojan
This refers to the inspection conducted by Mr. R. F. Fish of this office on
April 14-18, 1980 of activities authorized by NRC License No. NPF-1, and to
the discussion of our findings held by Mr. Fish with Mr. W. S. Orser and
other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representat!.e records, inter-
views with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into a level as described
in our correspondence to all NRC licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement
or explanation in reply including (1) corrective steps which have been
taken by ycu and the results achieved; (2) corrective steps which will
be taken to avoid further violations; and (3) the date when full compliance
will be achieved. No response to Item B of Appendix A is required because
you submitted a report on this matter, including the corrective actions
taken. The April 17-18, 1980 inspection included an examination of
pertinent information related to the excessive pH in the plant effluent
end va have no additional questions at this time.
ft,,0
[
8007150124
.
.
.
Portland General Electric Company
-2-
MAY 2 3 1550
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure.
The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
h.
W
e
H. E. Book, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
A.
Appendix A - Notice of Violation
B.
IE Inspection Report
No. 50-344/80-07
cc w/o enclosure B:
C. P. Yundt, PGE
F. C. Gaidos, PGE
J. W. Lentsch, PGE
_