p MATT!!.L TRf."TUTQ U?".?!!TH d pa "%,'o,'n C0HilES 2.7MD." iT3 UNITED STATES 8
NUCLEAR REGULATORY COMMISSION e
REGION 11 g
o,
- f 101 MARIETTA ST., N.W., SUITE 3100
- [
ATLANTA, GEORGIA 30303 In Reply Refer To:
MAR 131980 RII:JWB 70-1151/80-05 Westinghouse Electric Corporation AITN:
M. D'Amore, Manager Columbia Plant Nuclear Fuel Division Drawer R Columbia, SC 29205 Gentlemen:
This refers to the inspection conducted by J. W.
Bates of this office on February 11-15, 1980, of activities authorized by NRC License No. SNM-1107 at Westinghouse Nuclear Fuels Division, Columbia Plant and to the discussions of our findings held with M. D' Amore at the conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material", and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements. These items and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-tions. Section 2.201 requires you to submit to this office, within 20 da;.s of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; I
(2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Details of activities invol-ving safeguards and security measures are exempt from disclosure in accordance with 10 CFR 2.790(d).
Therefore, your response should be incorporated in a sep n ate paper and referenced in your reply.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosures to this letter with the exception of the report cover page, which is an inspection summary, will not be placed in the Public Document Room.
8007180 3 74 e
MATERIALTE!JU.'TTED !!rE"!TH C0t!Tf.1::S 2.73 IEElG t
EIEE!!lIIi!!IffiTED !!EPPllITif 4
COUI.!?;S 2.70]!i:.:Or. me Westinghouse Electric Corporation MAR 131980 Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sinc ely, d
MV 1
p
. Kenta, Chief Safeguardd Branch 1
Enclosures:
1.
Appendix A, Notice of Violation (Exempt from Disclosure) 2.
Inspection Report No. 70-1151/80-05 (Exempt from Disclosure) 3.
Inspection Summary (Not Exempt) s.s.
gTEEff.l.TRt.!!SMITTED I!EREYl!TIl CONit,I. tis 2.7ES i"F0"J.AI!3il 2