Forwards IE Insp Repts 50-546/80-19 & 50-547/80-19 on 800513.No Noncompliance Noted
ML19320B244
Person / Time
Site: Marble Hill
Issue date: 06/03/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML19320B245 List:
References
800630, NUDOCS 8007100096
Download: ML19320B244 (2)


See also: IR 05000546/1980019

Text

_

__

-.

_-

TIC

'

m

/

o

UNITED STATES

,7

8"

/o

NUCLEAR REGULATORY COMMISSION

Y

$(

nE

REGION 111

U[

799 ROOSEVELT ROAD

o,

,

GLEN ELLYN,ILLINols 00137

%-

o

  • ...*

MUN

3W

3

i

bocketNo.50-546

Docket No. 50-547

Public Service of Indiana

ATTN:

Mr. S. W. Shields

Vice President - Electric

System

1000 East Main Street

Plainfield, IN 46168

Gentlemen:

This refers to the inspection conducted by Miss R. J. Greer of this office

on May 13, 1980, of activities at the Marble Hill Nuclear Power Plant

Construction site authorized by Construction Permits No. CPPR-170 and No.

CPPR-171 and to the discussion of our findings with Mr. T. Burns and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

/ the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

-tion identified in the application is contained in an enclosure to the

application.

8007 $900 % -

-

-

(-l

.

.

0

,

.

Public Service of

-2-

Indiana

b[JN

3 1980'

We will' gladly discuss any questiens you have concerning this

inspection.

.

Sincerely,

8

O

'

d44

-

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

IE Inspection

Reports No. 50-546/80-19

and No. 50-547/80-19

cc w/ enc 1:

C. Kammerer, CA

H. Thornburg, IE

Mr. G. N. Brown, Project

Director

Central Files

Reptoduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

LeBoeuf, Lamb, Leiby & MacRae

Mr. Dave Martin, Office of

Attorney General

Mr. John R. Galloway, Staff

Director, Environment, Energy

and Natural Resources Subcommittee

2

!