ML19320A714

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept (PRD-80/11) Re Rosemount Model 510 Du Trip Unit & Final Deficiency Rept (PRD-80/11) Re Model 1152 Pressure Transmitters
Date released: 11/30/2019 Download: ML19320A714


Interim Rept (PRD-80/11) Re Rosemount Model 510 Du Trip/ Calibr Unit W/Common Mode Failure of Essential Switch That Determines Trip Output Logic.Ge Has Issued Field Disposition Instructions for Onsite Repair
ML19320A717
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/24/1980
From:
MISSISSIPPI POWER & LIGHT CO.
To:
References
Download: ML19320A717 (1)
Final Deficiency Rept (PRD-80/11) Re Model 1152 Pressure Transmitter W/Common Mode Failure of Capacitor at Greater than 175 F or When Damping Potentiometer Is Rotated Clockwise.Ge Issued Field Disposition Instructions
ML19320A715
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/24/1980
From:
MISSISSIPPI POWER & LIGHT CO.
To:
References
Download: ML19320A715 (1)
Forwards Interim Deficiency Rept (PRD-80/11) Re Rosemount Model 510 Du Trip Unit & Final Deficiency Rept (PRD-80/11) Re Model 1152 Pressure Transmitters
ML19320A713
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/24/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19320A713 (2)