AECM-80-141, Forwards Interim Deficiency Rept (PRD-80/11) Re Rosemount Model 510 DU Trip Unit & Final Deficiency Rept (PRD-80/11) Re Model 1152 Pressure Transmitters
| ML19320A713 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/24/1980 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19320A714 | List: |
| References | |
| AECM-80-141, NUDOCS 8007020538 | |
| Download: ML19320A713 (2) | |
Text
N $cbO NP OS3b MISSISSIPPI POWER & LIGHT COMPANY l
Helping Build Mississippi EnMWeddA P. O. B O X 16 4 0. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 June 24, 1980 p.ooveriou oc
.=vu c=,
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Director
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/13526 PRD-80/11, Interim Report, Rosemount Model 510 DU Trip / Calibration Units and Model 1152 Pressure Transmitters AECM-80/141 On March 27, 1929, Mississippi Power & Light Company (MP&L) noti-fied Mr. F. Cantrell of your office of Potentially Reportable Deficiencies t
(PRDs) at the Grand Gul? Nuclear Station (GGNS) construction site. These deficiencies concern Rosemount Model 510 DU trip / calibration units and Model 1152 pressure transmitters.
The deficiency with respect to the Model 510 DU Trip Unit had pre -
viously been reported to the NRC as a reportable condition per 10CFR50.
55(e). This is documented by our letter to you, AECM-80/31, dated Jan-uary 30, 1980. The corrective actions described in the attached interim report pertain to the NSSS scope of supply. We expect to submit a final report by October 22, 1980.
We have determined that the deficiency pertaining to the 1152 Pres-sure Transmitter is reportable within the meaning of 10CFR50.55(e).
De-tails are described in the attached final report.
Yours truly,
-q p r J. P. McGaughy, Jr.
Assistant Vice President, Nuclear Production ATR:mt Attachment 8007020 h [
Member Middle South Utilities System
MISSISSIPPI POWER & LIGHT COMPANY
- Mr.'J.,P.~O'Reilly AECM-80/141 NRC Page 2 P
cc:
Mr.-N. L. Stampley Mr. R. B. McGehee Mr..T. B. Conner
- Mr. Victor Stello, Director Division of Inspection & Enforcement' U. S. Nuclear Regulatory Coneission
- Washington, D.C.
20555 e
?
-> ^
2 i
e i
i
'e f
v w
- w--
e-n-<
, -, - - +
v r,
v vv v-
-