ML19320A140
| ML19320A140 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/03/1974 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19320A139 | List: |
| References | |
| NUDOCS 8004140736 | |
| Download: ML19320A140 (2) | |
See also: IR 05000313/1974005
Text
_ _ _ _
_ - - -
.
,
g
5% '*w
"S
UNITED STATES
i
l
b)a / h-) +t.,
Al vMIC ENERGY COMMISSION
(.3 l.4
DIRECTORATE OF REGULATORY OPERATIONS
,
gg
REGloN ll - ' SUIT E 818
,,
kg
2M PE ACHf REE ST REE T. NoRT HwEST
g g g g ,,,,,,, , ,404esae 4303
V
pge
AT L. A N r A GEoRG4 A 3)*J03
In Reply Refer To:
APR 3
1974
RO:II:RCP
50-313/74-5
.
Arkansaa Power and Light Company
ATTN:
Mr. J. D. Phillips
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
-
Gentlemen:
This refers to tb inspection conducted by Messrs. Murphy, Parker, and
Whitt of this office on March 4-8, 1974, of the implementation of the
quality assurance program for operation of the Arkansas Nuclear One,
Unit 1 facilf ty, and to the discussions of our findings held by Mr. Murphy
with Messrs. Anderson and Cavanaugh at the conclusion of the inspection.
The purpose of this inspection was to make a determination through in-depth
. inspections whether your quality assurance program has been satisfactorily
i
~
implemented or would be implemented prior to licensing for those quality
affecting activities associated with the initial fuel load and startup and
operation of the plant. Within these areas, the inspection consisted of.
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
Significant deficiencies in the implementation of your quality assurance
program for operations were detected in areas related to each of the
eighteen criteria of Appendix B to 10 CFR 50 and are identified in Section
III of the summary of the enclosed report as unresolved items. Weaknesses
identified in the implementation of the ANO-1 organization for quality
assurance during operations (Criterion I) have been forwarded to Regulatory
Operations, Headquarters for evaluation and action. You should expect to
'
i
hear from them in the near future. AP&L will be required to have a
satisfactory QA program for operations implemented prior to licensing.
Guidance with regard to acceptable methods for implementation of your QA
l
program for operations can be found in appropriate Regulatory Guides and
national standards. We understand that AP&L has made a commitment to have
their program for operations implemented by April 15, 1974. These items
will be inspected during subsequent prelicensing inspections.
b
'
'ggy!.SINT T0: PDR
(
LPDR
p-
.I
8 0 0 414o 7sg
U ,5^' /q /
.
,
,
. , . - -
-
. . -
. .
- ' . ,
. . _ __
__ __
'
.
.
~
.
...
.._
-
pd . ..
-
-
.
Arkansas Power and Light
-2-
APR 3
1974
Company
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
,
Title 10, Code of Pederal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
j
.
Room. If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
'
this office requesting-that such information be withheld fro.y public
disclosure. If no proprietary information is identified, a written
statement to that effect should be submitted. If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
,
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not antacted as
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
=
/>
m
Norman C. Moseley
Director
Enclosure:
.
RO Inspection Report No.
50-313/74-5
4
,
!