Forwards Insp Rept 50-313/74-05 on 740404-08.No Noncompliance Noted
ML19320A140
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/03/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19320A139 List:
References
NUDOCS 8004140736
Download: ML19320A140 (2)


See also: IR 05000313/1974005

Text

_ _ _ _

_ - - -

.

,

g

5% '*w

"S

UNITED STATES

i

l

b)a / h-) +t.,

Al vMIC ENERGY COMMISSION

(.3 l.4

DIRECTORATE OF REGULATORY OPERATIONS

,

gg

REGloN ll - ' SUIT E 818

,,

kg

2M PE ACHf REE ST REE T. NoRT HwEST

g g g g ,,,,,,, , ,404esae 4303

V

pge

AT L. A N r A GEoRG4 A 3)*J03

In Reply Refer To:

APR 3

1974

RO:II:RCP

50-313/74-5

.

Arkansaa Power and Light Company

ATTN:

Mr. J. D. Phillips

Senior Vice President

Sixth and Pine Streets

Pine Bluff, Arkansas 71601

-

Gentlemen:

This refers to tb inspection conducted by Messrs. Murphy, Parker, and

Whitt of this office on March 4-8, 1974, of the implementation of the

quality assurance program for operation of the Arkansas Nuclear One,

Unit 1 facilf ty, and to the discussions of our findings held by Mr. Murphy

with Messrs. Anderson and Cavanaugh at the conclusion of the inspection.

The purpose of this inspection was to make a determination through in-depth

. inspections whether your quality assurance program has been satisfactorily

i

~

implemented or would be implemented prior to licensing for those quality

affecting activities associated with the initial fuel load and startup and

operation of the plant. Within these areas, the inspection consisted of.

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were disclosed.

Significant deficiencies in the implementation of your quality assurance

program for operations were detected in areas related to each of the

eighteen criteria of Appendix B to 10 CFR 50 and are identified in Section

III of the summary of the enclosed report as unresolved items. Weaknesses

identified in the implementation of the ANO-1 organization for quality

assurance during operations (Criterion I) have been forwarded to Regulatory

Operations, Headquarters for evaluation and action. You should expect to

'

i

hear from them in the near future. AP&L will be required to have a

satisfactory QA program for operations implemented prior to licensing.

Guidance with regard to acceptable methods for implementation of your QA

l

program for operations can be found in appropriate Regulatory Guides and

national standards. We understand that AP&L has made a commitment to have

their program for operations implemented by April 15, 1974. These items

will be inspected during subsequent prelicensing inspections.

b

'

'ggy!.SINT T0: PDR

(

LPDR

p-

NSIC

.I

8 0 0 414o 7sg

U ,5^' /q /

TIC

.

,

,

. , . - -

-

. . -

. .

- ' . ,

. . _ __

__ __

'

.

.

~

.

...

.._

-

pd . ..

-

-

.

Arkansas Power and Light

-2-

APR 3

1974

Company

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

,

Title 10, Code of Pederal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

j

.

Room. If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

'

this office requesting-that such information be withheld fro.y public

disclosure. If no proprietary information is identified, a written

statement to that effect should be submitted. If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

,

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not antacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

=

/>

m

Norman C. Moseley

Director

Enclosure:

.

RO Inspection Report No.

50-313/74-5