RO 50-313/76-32:on 761021,reactor Bldg Chilled Water Inlet Isolation Valve CV-6202 Inoperable.Caused by Foreign Matl in Solenoid Valve Preventing Positive Actuation.Solenoid & Supply Lines Cleaned
ML19320A089
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/17/1976
From: Cook R
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A083 List:
References
NUDOCS 8004140698
Download: ML19320A089 (4)


Text

. - _ _ _ _ _ _ _

' : O.

UCENSEE EVENT REPORT CONTROt SLOCx:l l

l l

l l

l cnsassmie:Tauneeumso - anom)

O 1

6 "5""

'i'"PE 7v's ocm. NuM.R

.E IAIRIAIRIKil I 101o1-10101010101-10101 141IIIIIi 11 10131 7 11 9 14 15 25 28 30 31 32 N @ lol5lol-ldI31113 I Ii10121117161 1 I I I I i 1717161 DOCx(T ~

R EVENT OATE REPORT DATE Catsoomy E cowr i l

l

[.LJ 7 ll 57 58 59 80 81 88 89 74 75 80 EVENT DESCR5 MON 7q 9l b s& 4 siat + xtt. om ochbevil.19 A a w=vewtakoe insidewance deck I

80

@ l was o.,f c =4 W ewli tk. b.bL:L, CL;ll.4 Wake, Intet 15elab %(CV G2.023. l.

i e,

go e WabVe nervm&I maese maaedl clase be.1 tasee.ll 4 enn,t oas te &$ktv RooveIdew2kelv h 35 se%4.. b s; b -.0 &w E,,,. {To-313lT/..E2) 3 Wi i

7 89 80

,,,,e Y

NT CODE MANUFACTUWI W1An0N E ISill (

IVik" 5'lVlolPl

[_AJ dl919191 7 11 9 10 11 12 17 43 44 47 48 CauSE OESNON DE IInsa.e6.f solenoid vdv. adamb revealed be% a.abist M oreueatea, ;Eiue 1

7 9

80 laeluark=.%e de..ravato, and air mA line nuevv eleaued and 4Le value uas rekesbd.

I elb D804fd C#4*kI U4Ide 094 Faked hveterb &#d hel YtkhvMed b SeVVICf.

1'

% POWER O

VE OECOVERv OESCmPTON

[E_]

1o1919I I NXERSTATUSl LbJ l

9A I

i 7 8 9

10 12 13 44 45 48 80 To of Ela Rn gNT o,.CTwv toCAToN c, REu SE 7 8 9

10 11 44 45 00 PERSONNEL EXPOSURES i

NuadeEn TveE DEsCmPTON E IQolol LEJ l

9A I

7 89 11 12, 13 80 PERSONNEL INJURIES NUM8EA DESCRpTON 8 1010101 1

NA I

7 89 11 12 80 OFFSITE CONSEQUENCES EI WA I

7 89 80 LOSS OR OAMAGE TO FACIUTY TYPE DESCRpTON

@ [1]

I DA I

7 89 10 80 PUBUC!TY DE I MA I

9 80 AOOITIQNAL FACTORS I

NA I

7 89 80 8004140878' gg ;

NA.JN cook

,csse ni.um Attachmefit D" c'o **i

    • T L

s

Page 1 of 3 O

o 1.

Reportable Occurrence Report No. 50 313/76-32 4

2.

Report Date: Nove.eber 17, 1976 3.

Occurrence Date: October 21, 1976 s

4 Facility:

Arkansas Nuclear One - Unit 1 Russellville, Arkansas i

5.

Identification of Occurrence: Inoperable valve in Reactor J

Building Chilled Water System.

f, I

l 0

L, 2

6.

Conditions Prior to Occurrence:

h.

Steady-State Power X

Reactor Power 2542 MWth Hot Standby Net Output 824 MWe f

Cold Shutdown Percent of Full Power 99 %

O Refueling Shutdown load Changes During Routine D

Power Operation Routine Startup Operation Routine Shutdown Operation Other (specify)

)

,1 t

b 7.

Description of Occurrence:

On October 21, 1976, at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> a preventative maintenance check was made by cycling valve, CV-6202, Reactor Building Chilled Water Inlet Isolation Valve. The valve would shut then reopen after approximately 35 seconds.

I t

(

NSP-III-2, Rev. 5 Attachment "D" 5

October 1, 1976 Page 2 o# 4

-m

=

s Page 2 cf 3 Reportable Occurrence Report No.

50-313/76-32 s

8.

Designation of Apparent Cause of Occurrence:

Design Procedure s

Manufacture Unusual Service Condition I

Including Environmental Installation /

\\

Construction Component Failure.

X s

(See Failure Data) 5 Operator Other (specify) -

i Foreign material found in the solenoid valve which prevented c

positive actuation.

i 4

s 1

~

s 9.

Analysis of Occurrence:

t Even though the isolation valve was proven inoperable, the check valve (tested April 30, 1976) would prevent any back flow, hence there was no hazard to the health and safety of the 5

public.

i

'L October 1, 1976 NSP-III-2, Rev. 5 Attachment "D" 5

Page 3 Of 4 i

i

.S,.

- s p

Page 3 of 3 t

Reportable Occurrence Report No. 50-313/76-32 4

10. Corrective Action:

)

i lhe solenoid and supply lines were cleaned and the valve tested.

)

The test proved the valve operated properly and was returned to service r.c 2340 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.9037e-4 months <br /> on October 21, 1976.

p

.i 4

?

s k

i

.1 11.

Failure Data:

L Solenoid Actuator Data:

ASCO three position solenoid valve P

'i

\\

\\

.r i

October 1, 1976 NSP-III-2, Rev. 5 Attachment "D" 5

Page 4 of 4

-. - - - - - -- - h