ML19320A086
| ML19320A086 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/17/1976 |
| From: | Cook R ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML19320A083 | List: |
| References | |
| NUDOCS 8004140695 | |
| Download: ML19320A086 (4) | |
Text
-
O
~
UCENSEE EVENT REPOR.
CONTROL 8 LOCK:1 I
I I I I
I (M. EASE PREET A&L MSBUSED WIpJMAATWN]
1 8
LctNet NunneEA E lA IRIAlikli i 101o1-1o1010101o1-1o101 14 I I I I I I I I I 1031 7 Il 9 14 15 25 28 30 31 32 N @ 1015101-101311131 coCxt? NutdeEA EVENT CATE REPORT DATE CATsoom l(j I l 1012.1017 lfo 1 I l 11 11 17 I Tlfo l g anri l l
I 7 11 57 58 59 80 61 88 Se 74 75 80 EVENT OESC N ion Oshio.t9%, u,L;)e at. Shaas.stah e 4h. (99% FM.;t was I
7 9
80
@ ldi.--eva +L4
.00:44e e metodide votav intwi~ks _4 ciraA;4rv wecW l.
7 il9 80 E 11esh uk a.J.4 C.e lo-ts % was met. sorten=4. Si ilAe oam
.f (kis bn I
80
)
7 119 Iwere ves=tedin Roh so-silDL-2.504slA 19.w So48/M 23. (50-315I76 30.
I W@
i
- i
~
7 Il 9 80 j
paese NT C VOLATON 07 II I [E]
121 III III (Zj 17191919I (N_j 7 11 9 10 11 12 17 43 44 47 48 CAusE OEsCRsmON il Ihiemb J eo=.Jammt m. 2:- caused ime.e.ser ukeastim.. %4utra Lw beenl
,o lveviewed and m.C.,b, ~.. e_% kaue rnatted s hat bILis one.
I 9
80 s
l l
[Ej 101919 I I M$
I
[.hJ l MA i
OsCovtAv OESCAspTON i
7 8 10 12 13 44 45 48 80 AEL 0
OF NT OF ACTMTV LOCATON OF RELEASE 7 8 9
10 11 44 45 80 PER8ONNEL EXPOSURES 1
DE 10T01 1 l ~NA I
7 89 11 12, 13 80 PERSONNEL INJURIES
~,
at 161 I"~ 'NA I
7 89 11 12 20 OFFSITE CONSEQUENCES 8I NA I
7 89 80 LOSS OR DAMAGE TO FACILITY
@ [TJ I"7 A I
7 89 10 80 i
PU8UCITY Da l NA I
9 80 ADOmONAL FACTORS l
l NA I
l 7 89 80 gg I 8004140695 7,oA M
_,.(500371-42%
A,em.w..ne nn"
......T
x s
Page 1 of 3 1.
Reportable Occurrence Report No.
50-313/76-31 2.
Report Date: November 17, 1976 3.
Occurrence Date: October 20, 1976 4
Facility:
Arkansas Nuclear One '- Unit 1 4
Russellville, Arkansas 5.
Identification of Occurrence:
Failure to comply with Surveillance Test Schedule.
t 6.
Conditions Prior to Occurrence:
i Steady-State Power X
Reactor Power 2540 MWth Hot Standby Net Output 824 MWe Cold Shutdown Percent of Full Power 99 Refueling Shutdown Load Changes During Routine Power Operation Routine Startup Operation Routine Shutdown Operation Other (specify) l A
7.
Description of Occurrence:
It was found on October 20, 1976, that the following test was not conducted at the required surveillance interval.
Offsite power protective relaying interlocks and circuitry weekly test scheduled for 10-15-76 was conducted on 10-20-76.
NSP-III-2, Rev. 5 Attachment "D" 5
October 1, 1976 Page 2 of 4
~
Page 2 of 3 Reportable Occurrence Report No. 50-313/ 76 31 4
8.
Designation of Apparent Cause of Occurrence:
Design Procedure Manufacture Unusual Service Condition i
Including Environmental Installation /
Construction Component Failure (See Failure Data) 5 i-l Other (specify) "
X l
Due to resignation of cognizant supervisor, the test was improperly scheduled and was late being executed.
r 9.
Analysis of Occurrence:
Surveillance tests have been satisfactorily completed since these occurrences, thus there was no hazard to the health and safety of the public.
i i
3 s
I October 1, 1976 NSP-III-2, Rev. 5 Attachment "D" 5
Page 3 Of 4 l
L.
=
,,----/.=.u-
. w.
T Page 3 of 3
\\
Reportable Occurrence Report No. 50-313/76-31 4
- 10. Corrective Action:
Recognizing that responsibility has shifted, therefore proper scheduling will be implemented.
M '
11.
Failure Data:
Similar Reports:
76 The pilot cell voltage readings for station batteries were not taken.
76 Failure to perform surveillance test on Control Room emergency ventilation system at required frequency.
i 76 Failure to comply with surveillance test schedule.
^:
s
.i October 1, 1976 NSP-III-2, Rev. 5 Attachment "D" 5
Page 4 of 4