See also: IR 05000313/1973003
Text
_ .
.
_
'
.
.
O
_
.
~
.
[8 f
[
UNITED STATES
'
ATOMIC ENERGY COMMISSION
,
-
'
h*
i DIRECTORATE OF REGUIATORY OPERATIONS
7
e
l
4# )q[y
y
mEoion n - suite ais
,
g
230 53E ACMT REE STREET, NORTHWEST
D4rts '
AT L. ANT A, GEORGI a 30303
o
,
i.
l
In Reply Refer To:
MAR 211973
RO:II:MSK
50-313/73-3
.
!
',
.
Arkansas Power and Light Company
.
Atta: Mr. J. D. Phillips
.
'
-
Vice President and Chief Engineer
,
Sixth and Pine Streets
,
,
Pine Bluff, Arkansas 71601
3
.
Gentlemen:
l!
This refers t3 the inspection conducted by Mr. M. S. Kidd and otha.r members
of this office on February 20-23, 1973, of the activities authorized by
AEC Construction Permit No. CPPR-57 for the Arkansas Nuclear One, Unit 1
facility, and te the discussion held with Mr. J. W. Anderson and other.
members of your staff at the conclusion of the inspection.
.
Areas examined during this inspection included previously identified
unresolved items, preoperational test procedures and test results, Safety
Review Committee audit procedures, tha Safety Review Corsnittee charter,
the station log, radioactive waste disposal systems, and environmental
monitoring and health physics procedures. Within these areas, the inspec-
tion consisted of selective examinations of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities appear
to be in noncompliance with you Final Safety Analysis Report. These acti-
vities asa reference to pertinent requirements are listed in Part I of the
enclosure to this letter.
-
This notice is sent to you pursuant to the provisions of Section 2.201 of
the AEC's " Rules af Practice," Part 2, Title 10, Code of Federal Regulations.
-
Section 2.201 requiras fou to submit to this office within thirty (30) days
of your receipt of this notice, a written statement of explanatica in reply
including: (1) corrective steps which have been taken by you, and the results
-
achieved; (2) corrective steps which will be taken to avoid further viola-
-
tions; and (3) the date when full compliance will be achieved.
,_
'l
-
.
\\
.
,
%
,
,
.
- -
8004140 Q
-.
-
.
.
.
-
.
-
_ _
-
.
~
i
1
- .
'
,
.
MAR 211973
.
-
Arkansas Power and Light
-2-
- -
t
Company
i
.
!
l
Previously identified and new outstanding items are summarized in Parts II
through IV of the enclosure to this letter.
'
Concerning the items of noncompliance brought to your attention in
',
Enclosure 1 of our letter dated October 19, 1972, we have examined your
corrective actions and have no further questions.
-
.
You should note that this letter and your reply to this letter will be
disclosed to the public be being placed in an AEC Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
3
~
Very truly yours,
'
!
ffGZ&
,
Norman C. Moseley
Director
l
Enclosure:
,
As stated
.
.
.
i
e
%
S
l
4
l
.
-e
,p-w
w
, - - - - -
--
n
. - -
v
---
am
---
__,
. - _ - _ _ - _ -
_
-
.
,
.
I
i
f)
-
-
'
'
.
.
.
t
ENCIDSURE
),
Arkansas Nuclear One, Unit 1
Ii
Docket No. 50-313
_
l
I.
Enforcement Action
'
-*
A.
Violations
Section 11.1.3.7.2 of the Final Safety Analyses Report (FSAR)
,
states, in part, that for the waste gas decay tanks,3. ch of
ea
,
,
the waste gas decay tanks har a capacity of 325 feet
Table
11.6 of the FSAR states, in part, that for the waste gas surge
3
volume, feet / gallon - 29/216.
tank:
-
.
Contraty to these requirements, the inspector determined through
'
observations, that the nameplate data for each of the four waste
'
gas decay tanks stated e volume of 2025 gallons (which would be
,
3
equivalent to approximately 270 feet ) and for the waste gas
,
,.
surge tank, a volume of 197 gallons.
g
(;
B.
Safety Items
F
None
II.
Licensee Action on Previously Identified Enforcement Matters
I
-
There were no previously. identified enforcement. matters which had
not been resolved prior to this in,spection.
l
III. New Unresolved Items
.
73-3/1 Completion of the Radiological Waste Disposal Systems
}
Installation of the radiological waste systems continues
i
but none of these systems are completed.
l
IV.
Status of Previously Reported Unresolved Items
.
A.
Bechtel Startup Manual
Comments on this document outline in R0 Report No. 50-313/73-1,
Details, paragraph 7, have been incorporated in a rewritten
'
'
version.-
.
i
This item is resolved.
3
i
-
-
I
_
_.
.
__
_
,
.
.
, , _
_ _ , . .
. _ _ -.
.
-.
-
-
__
_ ._
,
,
,
,
-
.
.i
f~')
.
.
(s_/
'
.
_2-
-
B.
Flushing Procedures
Procedures have been written and are being used to conduct
final flushes for the various primary systems.
f
This item is resolved.
C.
Staffing
i
,
Two more waste control operators are needed to fulfill FSAR
committments.
.
D.
Onsite Training Program
,
'
- The training program described in RO Report No. 50-313/73-1,
Details, paragraph 9, was started January 8, 1973, and will
run until all subject areas are completed.
j
E.
Incorporation of All Safety Related Equipmene in the FSAR Q-List
~
.
This subject was not discussed during this inspection.
,
F.
Documentation of the Station Test Coordinator's (STC)
'
Prerequisite Duties in the Conduct of Tests
.
l
'
The licens.ee's plans for documentation of these duties described
in R0 Report N'o. 50-313/73-1, Details, paragraph li, have been
1
implemented. The revision of the Plan For Preoperctional
Testing (Plan) which describes .this documentation process has
not been approved.
-
'
G.
Preparation of Test Procedures to Cover
- s in Guide
.
e
For Planning of Preoperational Test Prog - as (Guide),
j
Procedures for all the tests identified in RO Report No. 50-313/
72-9,Section IV, paragraph 4, have ueen identified with the
exception of one for a loss of instrument air test.
'
"
H.
Implementing Procedures For Use of Jumpers and Bypasses, 73-1/1
Licensee personnel plan to write a detailed procedure covering
the use of jumpers and bypasses.
.
4
$
'
OO
,
.
l
.
..--
.
. - . - . . .
-.
.-_
- . . .
- . -
- - - . .
-
. . - - . . .-.. . _ . . - . _
-
_ . _ _ .
- -
.
. _ . . - _
..
. - -. -
. _..
.
~
d
f
-%.
.
'
,
,
=
'
.
.
-3-
.
.
!-
j
-
I.
Comments on Core Flood Functional Test Procedure, 73-1/2
'
Commats by the inspector documented in RO Report No. 50-313/73-1,
i
Details, paragraph 15.f, have been incorporated into the procedure
by use of addenda. The rewriting and approval of the procedure
- ,
is.not yet complete.
.
.
&