Text

.

O

~

.

f".%,

n

UNITED STATES

p /

9 ') ,'t

A . .>MIC ENERGY COMMISSION

I

X*

s

  • r

DIRECT 0 HATE OF REGULATORY OPERATIONS

'V j-

r

i

accioN n - smvE sta

2 F188 ti AC H I R E E St reEE T. NORf MwCST

,, m , , ,,,, n

,

,,

e,

,

Ustig 49

A T 4. A N T A. GE ORG a a 30303

MAR 1

1974

.

-

In Reply Refer To:

-

RO:II:MSK

50-313/74-2

.

Arkansas Power and Light Company

ATTN: Mr. J. D. Phillips

Senior Vice President

Sixth and Pine Streets

Pine Bluff, Arkansas 71601

Gentlemen:

-

This refers to the inspection conducted by Mr. M. S. Kidd of this

office on February 5-8, 1974, of activities authorized by AEC

Construction Permit No. CPPR-57 for the Arkansas Nuclear One, Unit 1

facility, and to the discussion of our findings held by Mr. Kidd

with Mr. J. W. Anderson at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews Ith per mnnel, and observations by the inspector.

The status of unresolved items identified in previous inspection

reports is discussed in Section IV of the summary of the enclosed report.

New unresolved items are identified in Section III of the summary of

,

the enclosed report.

During the inspection it was found that certain activities under your

license appear to be in violation of AEC requirements. The violations

and references to pertinent requirements are listed in Section I of

the summary of the enclosed report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved. Violation A.1.b. was corrected

during the inspection and no additional response is required on this item.

DDPY SENT TO: PDR

_

,)

h'}

LPDR v

. /

'

'NSIC

8

0 410 0_2. M

.

.

,

_;

. ._

_

_ .

_

_ _ _ _ _.._ _ - - __ _ __ _ ._ _ _ _. _ _ _

.

.

'

'

' ht Co .

e2=

j

Arkansas Power and

9g74

.

.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will placed in the AEC's Public Document

Room. If this report contains e

information that you believe to be

!

proprietary, it is necessary that you submit a written application to

this office requesting that such information be withheld from public

'

disclosure. If no proprietary information is identified, a written

,

statement to that effect should be submitted. If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days. If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

'

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

l

g

Norman C.

oseley

Director

'

.

!

Enclosure:

RO Inspection Report

No. 50-313/74-2

,

,