Discusses 760227 Revision to 10CFR50.55a Re Inservice Insp Testing Requirements for ASME Code Class 1,2 & 3 Components. Dates Re Next 40 Month Insp Period & Submission of Tech Specs Amend Reflecting Revised Regulation Requested
ML19319E271
Person / Time
Site: Rancho Seco
Issue date: 04/22/1976
From: Reid R
Office of Nuclear Reactor Regulation
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
TAC-11288, NUDOCS 8004010543
Download: ML19319E271 (6)


Text

,;

s

=

J m.

DISTRIBUTION:

NRC PDR OELD L PDR.

OIGE (3)

_ Docket Fil RReid

' Docket No.: 312 ORB #4 Rdg VRooney (2)

VStello RIngram se KGoller DEisenhut g2 TCarter JRBuchanan 2fgg Sacranento ifunicipal Utility District TBAbernathy AITJ: lir. J. J.11sttinoc ACRS (16)

~;

JD 0

' Assistant Cencral !!anegor mm 0

DJ t Chief Engineer 6201 S Street-y[

?. O. _ Box 15830 m

- 9 T M-

-l Sacranento, California 95813 D

. JJ

. A lld _a v

Centlenen:

RE:- RANCHO SECO We wish to call your attention to the fact that the incervice inopcetion 9

testing requirenonts for ASliE Code Class 1, 2 and 3 conponents for nuclear

]

power plants delineated in 10 CFR Part 50.55a vero changed by a revision to the regulations published on February 27,1976 (copy enclosed). The reviced regulations require inservice inspection and testing to be perforned in accordance with the exacination and testing requirenents set forth in Section' XI of AS!!C, Boiler and Pressure Vessel Code, and Addenda. A review of the 1974 edition of AS:tE Section XI indicates that conflicts may occur between these requirenents and the technical specifications presently in effect for your facility. To avoid those and future conflicts, you sitould, in accordence with 50.55a(g)(5)(ii), apply to the Connission for cucnducnt of your technical specifications. Any such conflicting technical specifications should be replaced with a reference to 10 CFR 50.55a.

Sample language for such technical specification changes is provided as an enclosure.

As specified in the reviced regulation, for plants with Operating Licences incued-prior to March 1,1976, its provicions become effective citer Septonber 1,1976, at the start of the next regular 40 nonth inspection period. The initial inservice er.cninations conducted during the first 40 month period, and the initial incorvice tests of punps and valvec conducted

'during the first 20 nonth period, nuct conply with the requirencnts in editio1s of. the AS"E Code and Addenda in effect no more than 6 nonths prior

-to the dato of start of facility connercial operation.

If you detortinc that confornance uith certcin AS!!S Foction XI inservice inspection cud testing requirecents is' inpracticcblo, you r.hould subnit

'information to the Divfcion of Operating Reactors to support your deternin-ntienc in.accordence uith 50.55n(s)(5)(iii) and (iv). Your deterninations should ocparately _ identify the crccific AS!!E Code requirement that is inpracticable for ccch af fected conponent. Tic vill evaluate your 7.. _ _

g.. > u.

>e 800.401.0 b

~~

O~

_q-V,

~."";'

h.{

4:. ~ :.;. :

^2 -

c-

' 3scranento Municipal

^ Utility District

,Aa - required by the revised regulatienc, your request for artendment of

.~~:=

technicc1 specifications, cnd infornation to support any decerninctions thct.cenfornance with certain AGIF. code requirce.cnta is laproctict.ble neet

.;;p

- be;subnitted :at leact nis (6) nonths prior to the start of the inspection

s..g iug.

.pariod duringashich the provisions become applicchie for your facility.

-Uithin thirty (30) dcys of the recolpt of thio letter, ve request that

.:e j

. you inforn us of the date your fccility's next 49 c.onth incpection

^=<

period cooncnces end.the date you intend to nubnit your wendncut rec, test.

j If you hnvc any qtv.stions, piccce contact use

....Y')

Citiccrcly, Q h % ~tt

..,_q Ji2 9

robert Us Ecid, Chici Operating F.cactore Franch F4

_ z.;.]

Divinion of Operating T;enctors

'"?

Tuclonuren:-

~

1.

' Sample 'i'echnicci Fpcciffcetion Lenr,un;c

?..

10 CyF 50c(g)

D n

D '9'T a

.E b

..L M

a 2

op ric t >

ORB #4: g_ Cp R_

.vi=.- s *.

.VRooneyhrm. RR d

\\

. 4. /_{#76 -

L4fM o.n,.

E form AEC 518 (Rev. 9 53) AECM 0240 :

- 1'r u, s.oovsaw=sme paint =e omes son sas.ies

,M.h

'y:.7 9.

..an

..J;

.L..

,,,d,:

J, 4,. };;

.l'Yi'..L..

1 i

. c,

~

1 E

s. --

Sacramentoilunicipal Otility District

+. =

cc:. David S. Kaplan, Secretary and

-f. i

-General Counsel-2..=.

-6201 S Street uE Post? Office Box 15830..

'~r

=

. Sacramento, California 95813~

.u.

Business.and )!unicipal Department

' Sacramento City-County Library 828:I Street Sacramento,. California 95814 I.

52k:

III.

- n g-h.,

D-1

\\

4 1

k..

,i D

m;

. ', m r}

^ ^

  • y

-j...

m

_ pry..

e;.;.;

2

~

- s.

. E!: CLOSURE ~

o ee.:

SA!!PLE TEC1!MIC/1 SPECIFICATI0!i I.A!!OUACC

m The following language 'should be substituted,- as appropriate, into the

~~

Tech'nical Specifications *.here existing survei.llance require:ents

- arc' superseded by AS:!E 3ection XI inservice inspection and testing

- require =cnts:

a.. Incervice inspection of ASi!E Code C1' ass 1, Class 2 and Class 3

' components shall.be performed in accordance with Section XI of

.~the ASME Boiler,and Presure Vessel Code and applic ble Addenda as. required by 10 CFR So, Section 50.55a(s), except wherc specific uritten relief has been granted by the Inc pursuant to 10 CFR 50, Section 50.55a(g)(6)(1).

b.

Inservice ' testing of AS'!E Code Cicss 1, Class 2 and Cic:s 3

. pumps and valves shall be performed. in accordance t.ith Saction XI of the AS:E Boiler.cnd Pressure Vossc1 Code and applicabic Addenda as required by 10 CFR 50, Section 50.55a(g), c:: cept where specific written relief has been granted by the ::RC

. pursuant - to 10 CFR 50, Section 50.55c(g)(6)(1).

D D)

A LB: U L s.

s a

l' w

9

; W-

,7

-- =;,

e.

7 :-

-}

y]

s

~

~

PART 50 c bCENSING OF PRODUCTION AND UTILIZATION FACll.lTih::i the praervice exam nation rtquire-er s

% #3) Por construction perr. -

issued Cod 3 for Wmps and Valves fir Nue; att forth in Cecticn XI of editions a e

on. af ter July 1.1974, pumps which Power and Addenda

  • and the requ;te, ASME Boller and Pressure vess'c1 Code are part of the reactor coolant pressure ments appiteatie to valves set fcrth in and Addenda applied to the construc-sha!! meet the requirements articles I and 8 of editions of sect:en III tien of the partic. tar component in ac-
  • boundary 8 for Chss 1 components set forth in Sec.;; of the ASME Boiler and Pressure vessel cordance with paragraph ic). <d). te),

tion III of the ASME Boiler and Pres-R Code and Addenda or Icr Class 1 valves or tf e of this sectton.

sure Vessel Code and Addenda in ef.- of section III of the ash!E Bot er and iits Components which are classined

$ fect' on the date of order

  • of the cumpc: Pressure Vessel Code and Addenda in as ASME Code C: ass 2 and C: ass 3 and o

efec 12 rnonths prior to the date of is-or 12 months prior to the formal docket [ suanc;e of the construction perm:t is re-sup:: orts for componen's which are c!as-si.ed as ASME Ccde C: ass 1. Class.. and date of the arp11 cation for constructionn 8

a

$ permit. whienever is : ster: Procided qu: red. The vahes may meet the re-C: ass 3 snall be des;gnec and te provided cu;tements set forth in editions of these nat the applicable ASME Code provi-Codes or Andenda Weh han buome with access to mam W pufor.am o.

sions for pumps shall be no earher than e5cettve af ter the date of valve order or inserv:ce examination c. such compo-those of the Winter 1972 Addenda of the after 12 months prior to the date of nents and shall meet the preservice ex-ammaton requiremms su Mrd. m See-1971 edition. The pumps may meet the in subsecuent ssuance of the consWction pmL tron XI of editions of the ASME Botle.

recuirements set forth editions of this Code and Addenda which -p (31 Fcr construction permits issued on and Pressure Vessel Code and Adden-

_become e!!ective.

or af ter July 1.1974. valves uhich are da " applied to the construction of the Part of the reactor coolant pressure particular component.

gg3 yggy,3' boundar'/8 shall meet the recu:rements illis Pumps and valves which are clas-(1) For construction permits issued for Class ! components set forth in Sec-sined as ASME Ccce Class 1 shal; be de-

!icf1 tion III of the ASME Eciler and Pres-s gned and te provided wtth access to t

e sure Vessel Code and Addenda in ef-enable the perQrmance of inservice test-

!! censed f o er tic ~ va! es part of the reactor coolant pressure feet

  • cn the date of order' of the valve ing of the pumps anc valves for assessmg boundary'shall meet the requirements or 1:: months prior to the fortnal docket operational read; ness set forth in Sec-

"t f orth i" date of the a::;11 cation for construction tion XI of ecitions of the ASME Do:ler (1) The American Standard Code for rermit. whichever is later: Protz ded.

and Pressure Vessel Ccte and Adde::da" i

d pli ab! Code C ses or t.

f That the a::ph0atle AS?!E Code provi-applied to the constructien of the par-sicns for valves shall be no earher than tacular pump or vahe in accordance with Standard Code for Pressure Pipmg those of the Winter 1072 Addenda of the paragraphs tes and W of this sectio..

(USAS D31.1.0). Addenda and apph-1971 ed: tion. The valves may meet the or the Summer 1973 Addenda, whichever I on the date cable Code Cases in enect requirements set forta in subsecuent 1s later.

of order' of the valves or the Class I editions of th;s Code and Addenda wh:ch

'ivi Pum::s and valves which are clas-section of the Draf t ASME Code for 51".ed as ASME Code C; ass and C! ass 3 become c5ective.

Purnps and Valves for Nuclear Pcwer shall be desis:ned and be provided w:th

'g> Inservice inmection requ;tementu Addenda. and Code Cases in efett on the For a f acility whose construction, access to enable tne performance of in-

"j (1) date of order cf the valves;or perrnit was issued pr:or to January 1. 3 dervice testing of the pumps and valves U1) The nondestructive examination 1971. comoonents 'mcludine suopor:.o O for assessmg operat:onal reachness set requirements of para =: forth in Section XI of editions of the mt graphs 'gi'46 and igiiSn of this section

  • Boiler and Preuure Vessel Ccde and e ases 2 7

.and 1 e ce t to the extent pract: cal. Compcnents q Addenda

  • a:: plied to the construct:en j

which are part of the reactor coelan:

of the particular cump or valve or tne

!ves et orth in e

af t A t Code for Pumps and Valves for Nuclear pressure boundary' and their sunoorts Summer 1973 Acidenda, whichever is Poser and Addenda in e0cct on the da!e Shall meet the require: rents apphcable

later, j

of order of the valves may be apphed.

to com:onents rhtch are classined as

've All components 'inc!Uding sup-g The valves may meet the requirements 3 ASME Code Class 1. Other safety-re-ports) may meet the requ:rements sci set forth in editions of ASA B21.1. USAS N forth in subsequent editions of codes n.

& B31.1.0. and the Draft ASME Code !ct

  • lated pressure ves'els. piping. pumos and valves shall meet the recuirements sp.

and addenda or pert: ens thereof which

)

ramps and Valves for Nuclear Pwer. ; plicable to comoonents which are classi-become eMective.

Addenda, and Coce Cases. wh!eh btcame ; fled as ASME Code Clas.s : or Class 3.

t4) Throughout the service life of a m

eMective af ter the date of order of the

,21 For a f acility whose construction facility, components ' including sup-valus.

permit was issued on or af ter January 1.

ports > which are class; Sed as ASME Code (2) For comtruction permits issued on or 19;1. but before July 1.1974. cemponents Cisss 1. Class 2 and Class 3 shall meet "Nh

' including suopcrts wh:ch are class:-

the requirements. except design and ac-94 e

ed as ASME Ccde Class 1 and Class cess provisions Ond ::reservice examina

  • are hart of the reactor coolant pressure shall be designed and be provided wnh ti0n requirements. set ferth in Sectica boundary'shall meet the requirements access to enacle the performance of w XI of edit: ens of ine ASME Betler and for C:nss I valves set forth in editions of inservic exammation of such compo-Pressure "?sse! C0de and Addenda ~

m the Draft ASME Code for Pumps and Valves for Nuc! Pat Power and Addenda' nent3 'mclud;ng supports > anci ' lie test 3 that cecome e !ective subsequent to edi-in e5ect' on the date of order' of the for cperational readmess of pumps ana tions specided in para;raphs it' C ana vahes and the requirements app 3 cable to Valves. and stall meet the presery;ce ex-8'(3) of this section and are mcorpc-valves set forth in articles 1 and 8 of aminat;on requ:rements set forth m ed:*

rated by re:erence in par: graph 'on cf editions of sectionIIIof the ASMEBoi:er t:ons of Section XI of the ASME B0!;e; this section. to tne extent practical with-and Pressure Vessel Code and Addenda' and Pressure VesselCode and Addenda

  • in the limitat:ans of design geometry in e Tect on the date of order of the in ef ect 6 months prior tc the date Of and materials of construction of the valves. or (11) the requirements apph-issuance of the construction per=:t. The components.

cable to Class t valves of section III of compcnents includmg suppcrts) may

,1) The initial !"nservice exa:ninations the ASME Boiler and Pressure Ve?sel n eet tne requ:rements set forth in suc.

conducted during the first 40 montns Code and Addenda in e:Tect on the date sequent edit:cns of this code and ad-shall comply with the requirements in of order of the valve; Provided. hotcever.

denda wh;ch become efective.

the edificns of the c0de and r.ddenda in Dat if the valves are ordered more than i31 For a facihty whose ccnstructica effect no "cre than 6 menths prior to 1:: months prior to the date of issuance of permit was :ssued on or af ter July 1*

the date o start c'f facility commere:31 the construction permit, ccmpliance with 19'4 operation.

the requirements for Class I valves set sti C0=ponents which are classided (ii) ne inservice examinations con-forth :n editions of the Draft ASME as ASME Code Class I shall be designed ducted during successive 40-m nth pt-g and be prov:ded witn access to enal::e rieds throughout the service hfe of the

)

see om 5014 ror footnotes t tnrougn 6.

the pttformance of inservtce examma-facility thercaf ter shall comply wl'h MmenJed 48 FR 6tso.

tion of such ccmponents and shall meet h9 50-14a February 27,1976 g

1 W

nnn n

.v ng s

i 4 m.2

~

'~

l

{'

b

.g,

PART 50 o 1.lCENSINTOF PRODUCTION AND UTILIZATION FACILITIES L

$1_._.

~

those-requtremeri!n:editietdE j the the licensee that could result if th-

==

code and addenda in efect n2 = ore ths; requirements w:r2. imposed on : the'

=-

6 months prior to the s; art of each 40-facility.

tr.onth periodi,

till The Commission may require the F

- (ilD ' The initial inservice. tests : of licensee to follow an augmented insertice pumps and valves for assessing opera.

Inspection program for systems and com-tional readiness and system pressure ponents for which the Commission deems -

g tests' conducted during - the first. 20 that added assurance of structural reil-months shall comply w
th those require, abuity is necessary.

g raents in editions of the code and adden-e th> Protection systems: For construe -

E

. da in effect no mere than 6 months prior tc tion permits issued af ter January 1.1971 t3 the start of f acility ccmmercial opera.

  • protection systems shall meet the. re.

-- tion. -

Equirements set forth in editions or revi-

.. ty) -Inservice tests ~ of pumps and sions of the Institute of Electrical and

(

' v:lves for assessing c;erational readi-Electronics Enginet-s Standard: "Crl.

=

ness and system pressure tests conducted teria fer Protection Systems for Nuclear during successtre 20 month perlocs Power Generating Stations." (IEEE-279)

' throughout the service life of the iecility in ef'ect' on the fermal docket date of 7

- shall comply with those requirements in the app?lcatien for a construction per.

editions of the code and addenda in ei-mit. Protection systems may meet the l

fect no more than 6 months prior to the requirements set forth in subsequent edi.

~~

-start of each 00-month period.

- tlons or revisions of IEEE-279 which

47) Tor an operating facility whose become effective.

. operating licente was issued prior to ~

March 1,1970. the provisions of para-

graph igH4) of this sect:en sha!! become efective after September 1.1976, at the -

S sttrt of the next regular 40-month pe+

riod of a serics of such periods beginning

.I at the start of factitty commeretal opera.

tion.

. (S)(D The interrice inspection pro.

- gram for a fat'lity shall be revised by i

- the licensce, as necessary. to meet the tcquirements of paragraph (g)(4) of this T

secdom.

-~

f 11) If a revised inservice inspection y

if pregram for a fac:hty con *.icts with the w-technical spee!!! cation for the facihty.

{ the licensee Phall apply to the Commis-slon for amendment Of the technical specihcations to confctm the technical specification to the revised picgram. This application shall be suomitted at ler.st l

6 months before the start o'.he period

~ during which the provisions =ccome ap-pI! cable as determined oy paragraph ag)-

- 44) of this section.

(!!!),1f the !!ce: vee has determined

' that conformance with certain code re-

' quirements is imprae!! cal for his facility..

the licensee shall netify the Commission I

and submit inform tica to support his -

d i determinations.

'(lva, Where an examination or test requirement by the ecde of addenda is determined to be impractical by the !!-

censee and is not included in tite revised inservice inspection pregram as permat-ted by paragraph *g> t4) of this section..

I

~ the basis for this determination shall J I

be demonstrated to the satisfactica of '

the Commissten notlater than 12 months -

.I af ter the exmratica cf the initial 120 -

month period of operatien frc:n start of facility commeretal one atien and each

- subsequent 100-month ;cr:od of opera-tun during which the exammation or.

1 test is determined to be = practical.

1(61th The Commissien wi:1 evaluate

_ determinations under-paragraph (g)(371 F

. of-this secticn that cede requirements s -

. are impractical and may grant such re :

I

llef as it determines is author: Zed by law '
and will not endanger !!!e cr' property.

[:

. Er the common defense and security and '

tc

- is otherwise in the pu:!!c interest giving e

due consideratien to !.ie burden upon -

0 Ih M

e:

wg Li

+ewa,y 27,1978 -

- so.,4h V $'W 7

. n

} k e

3 7 gW gL 3

...t.o. t. s e.i s,

g u

l 2

y

,a:, + + m< t-.

g.~

r c

-m p

4

~

.