ML19319E004

From kanterella
Jump to navigation Jump to search
Discusses Deficiency Re Quality of Radiographs Taken on Reactor Bldg Liner Noted in Insp on 700917 & 19.Requests Corrective Action within 30 Days.Draft Ltr to Util Encl
ML19319E004
Person / Time
Site: Rancho Seco
Issue date: 10/28/1970
From: Rich Smith
US ATOMIC ENERGY COMMISSION (AEC)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19319D996 List:
References
04129, 4129, NUDOCS 8003270717
Download: ML19319E004 (4)


Text

-

~

hebbyn5>,>t.

(

  • y'*" '** g Ouy6.xi m.i.7 Len.

1 Q[l f UNITED STATES ATOMIC ENERGY COMMISSION

.j.{

l DIVISION OF COMPLIANCE *

\\

REGION V U8Fis M 2111 SANCRoFT WAY BERKELEY, CALIFORNIA 94704 in.m.o su-sizi car. ui October 28, 1970 s

Sacramento Municipal Utility District Attn:

Mr. John J. Mattimoe Assistant Chief Engineer P. O. Box 15830 Sacramento, California 95813 Gentlemen:

L This letter relates to the discussion Mr. R. T. Dodds of this office held with you and other members of your staff at the conclusion of the inspection conducted on September 17 and 19, 1970 of the construction activities authoriced by AEC Construction Permit No. CPPR-56 As noted during the discussion, an apparent deficiency was identified involving

)

an item not in conformance with statements in the Preliminary Safety Analysis

/

Report as identified below.

I 1.

The Preliminary Safety Analysis Report, Section 5.5.1.1.c. states, with respect to spot radiographs as an aid to quality control of welder's work on the containment liner, that the criterion for radiographic techniques shall be in accordance with paragraph W-51 of Section VIII of the ASME Code. Contrary to this requirement, our inspectors observed a number of radiographs that did not meet the film density requirements of W-51(a)(3) for the weld (example:

vertical veld between places 25B and 25C) and/or the penetrameter had not been properly shimmed for weld reinforcement to limit the variation e

in density from minus 157. to plus 307, as allowed by paragraph W-51(c)(3) of the code.

Picase provide us, within 30 days with your comments concerning this item and any steps which have been or will be taken to correct it and to minimize recurrence, including any appropriate changes that have been or will be made to your quality assurance program.

$ $b ah gNC p) 00'29

(

y pd:

Goosaro 7/,

{

j

)

a i

I

~

l l~

l r

! i 1

Should you have any questions concerning the matters discussed in this letter, you may communicate directly with this office.

J Very truly yours, i

\\

)

j

.r, - u th' " ~

-s i

R. W. Smith i

Director cc: Dowell Raasch, I

Project Engineer, SMUD John Jackson, Quality Assurance Director, SMUD i

e i

I 4

e 5

i t

r s

1 i

4 I

s E

(

e 1

1 l

I t.

g s

,t

' I

~

(V Sacramento Municipal Utility District P. O. Box 15830 Oacra=cato, California 95813 Attention:

Mr. John J. Matticoe Assistant Chief Engineer Centlemen:

This letter relates to the discussion Mr. R. T. Dodds of this office held with you and other members of your ctaff at the coaclusion of the inspcction conducted en September 17 and 19,1970 of the construction activities authorized by AEC Construction Permit No. CPPR-56.

~

1s noted during the discussion,, an apparent deficiency tras identified involving an item not in co. formance with statements in the Preliminary Safety Analycic

~

Report as identified below.

Q.

l.

The Preliminary Safety Analysis Report, Section 5.5.1.1.c.

states, with respect to spot radiographs as an aid to quality control of welder'c work on the containment liner, that the criterion for

^

radiographic techniques shall be in accordance' with Paragraph UW-51 l

of Section ~VIII of the ASME Co'de.

Contrary to this requirement, our inspectors observed a number of radiographs that did not meet the

~

film density requirements of UW-51(a)(3) for the weld (example:

vertical weld between plates 25B and 25C) and/or tile penetrameter had not been

. properly shimmed for weld reinforcement'to limit the variation.in density from minus 157. to plus' 307, as allow'ed by paragrapJi UW-51(c)(3) of the code.

t r.

\\_ '

'\\

_w w

-w.

-rw-

-w

J 4

-?-

Please provide us, within 30 days with your commente concerning this item cnd i

{

any steps uhich have been.or will be taken to correct it and to minimize recurrence, including any appropriate changes that have been or will be' made i.

to your quality assurance program.

l' Ghould you have any questions concerning the matters discussed in thiu lotter, you may corr:municate directly with thic office.

e i

Very truly yours, j

R. W. Smith Director i

i i

cc: Dowell Raasch, l

' Project Engine'er, SMUD

)

John Jackson, Quality Assurance Director, SMUD i

{