n i Draft Input for Safety Evaluation Report Crystal River Unit No. 3 Docket No. 50-302 13.4 Emergency Planning _

The applicant has established an emergency plan that describes those elements necessary for coping with emergencies =t the facility. The plan includes the organization for coping iith emergencies.

Agreements, liaison and communications have been made witt appropriate agencies that have responsibilities for coping with emergencies. The applicant has-defined categories of incidents, including criteria for determining when protective measures should be considered and for the notification of offsite support groups.

Arrangements have been made by the applicant to provide for medical support in the event of a radiological incident or other emergencies.

Provisions for periodic drills for both plant personnel and offsite emergency organizations have been included in the Emergency Plan.

I t

We have reviewed the Emergency Plan and conclude that it meets the criteria of Appendix E of 10 CFR 50, and that adequate arrangements have been made to cope with the possible consequences of the accidents at the site, and that there is reasonable assurance that such arrangements will be satis-factorily implemented in the unlikely event that they are needed.

15 5 Irdustrial Security The applicant has submitted a description of its Industrial Security Plan for a ctection of the Crystal River Unit Mo. 3 from industrial sabotage.

The information was submitted as proprietary infornation pursuant to Section 2.790 of the Commission's regulations.

We have 4

reviewed the program and conclude that adequate security provision; have been made for the Salem Huclesr Generating Station and that the plan conforms to the provisions or hegulatory Guide No.1.17.

14.1 Test and Startup Program (additional information).

1 We have reviewed the applicant's preoperational and startup testing program and conclude that it is in general accord with the AEC publications " Guide

'for the Planning of Preoperational Testing Programs" and " Guide for the Planning of Initial Startup Programs", except for clarifying some details relative to the testing of the ECCS.

The program will provide an adequate f

basis to confirm the safe operation of the plant and is therefore acceptable.