Approves Licensees Preparations for Implementation of QA Program Per Region II Completed Review of Facility Const & Preoperational Testing.License Should Be Conditioned to Reflect Any Unfinished Items.Items Encl
ML19319D617
Person / Time
Site: Crystal River 
Issue date: 11/10/1976
From: Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Boyd R
Office of Nuclear Reactor Regulation
References
NUDOCS 8003180654
Download: ML19319D617 (3)


Text

.

&W &sze;

~

me.

, y

--.. w

%.~.

L.,-m gR A

?'$.g;Q

,p. W :st..

.~uy g;

n-

.m.

p.. -

,.s w.,,..

w.

../ :

  • f4 a

v

~

z,,

~

[

Nov 101976 R. S. Boyd, Director

~

Division of Project Ifanagement, NRR FLORIDA POWER CORPORATION (FPC), CRYSTAL RIVER 3, DOCKET NO. 50-302 -

STAIUS OF FACILITY COMPLETION We"have been informed by our Region II office, based on their inspection results, that construction and preoperational testing of the subject facility have been substantially co=pleted in conformity with the corr-struction permit and the application as amended, with the exceptions listed in the enclosures. The Office of Inspection and Enforcement has no further itens which would preclude issuance of an operut.in;; liceu:c.

to penait facility operation up to its full design rating.

We belfove that FPC vill complete those items listed in encloste o A in the ver' near futuru and we will inform your staff pronptly of IE's ravicw enad cicseuut. siich respect to enclosure 3, in the evn.:t so:.m of the listed iter.s cra not coupleted prior to CL inauance ae recar. rend enac conalderation be given to conditioning the license to reflect any cafinished iteca.

No have ~ viewed the lice m e's preparntono for imple catation of the quality _;;urance Frogran for Opa_raticus, and have found that they meet the requiremnts af 10 C7R 50, appendh: a. as specified in tha ilmsee's Pre' r m, which was re tiemd by the Mfico of % clear quality Assurar. -c stcactor Regulation.

tvewt end it

n. newstee D. Thompsen, Acting Director Division of Field Oparations Office of Inspection and Enforcement

Enclosures:

A cnd 3 ns stated 474I r

cc:

R. c. DeYoung, DFH D '9 9 D

'TD M[

h

~L. Engle, DPM

-~

b j

g d bs J. F. Stol::, DPM

'N. C. Moscley, IE:II C. C. Cover L' Files n

s o

c *

.FQE![. -

FCE3, g IE :Dg;AD._

CC Jcdo G'a.

DTliCMPSON g._ -.- -

t p/76...

- fp

,s.~.=*

s 11/ 6 /76 11/ O

-. / / 7.6..

l---

on.*

!-., w.-___..._.

/

' r.. ac.us iae S-m acx mo

  • u.
  • eev s== =av a= w ec 5* ""- a= -

8 0 0 !) 1 8 ()

y

m

)

e.

Enclosure A Items to be Completed Prior to Fuel Loading 1.

Physica1' Protection Implementation of the industrial security program and satisfactory testing of equipment.

2.

Satisfactory Completion of the rollowing Preperational Tests a.

TP 180 Fire Protection System Functional - Complete except for Halogen test in cable spreading room.

b.

TP 203 BWST Functional - Testing in progress.

c.

TP 301-1 and 2 - Nuclear Instrumentation - Resolve cable deficiencies.

d.

TP 310 ES Actuation - Retest required due to change in setpoints.

e.

TP 360 Calibration of Atmospheric Radiation Monitors -

Work in. progress, 95% complete.

3.

ES Actuation Cabinets Resolution of inadequate cooling air flow to ES channel and actuation cabinets.

4.

Emereency Plan Inplementation Resolution of comments identified in IE Rpt. 50-302/76-7.

3.

Seismic Instrumentation Complete installation of seismic instrumentation and satisfactory performance of functional testing.

.3-Enclosure B Items to be Completed Before Initial Criticality 1.

Satisfactory Completion of the Following Test Procedures a.

TP 150 Post Accident H Purge Test - Scheduled for 2

November 9, following ILRT b.

TP 160-3 and 600 Reactor Building Coolihd - Resolve fan balance deficiency.

c.

TP 160-7 Reactor Cavity Cooling - Retest for additional data, d.

TP 207 Heat Tracing - Testing in progress.

(Applies to those systems required to support initial criticality).

TP 267 Nuclear Services Closed Cycle - Additional flow e.

data through seal cooler required.

f.

TP 267 CRD Cooling Functional - Flow balancing required to resolve low delta P on original test.

g.

TP 261 Liquid Waste Functional - Retest required, h.

TP 302-2 and 3 - Incore System - Resolve cable deficiencies.

1.

TP 362 Liquid Radiation Monitoring-Work in process, 95%

complete.

j. TP 600 Soluble Poison Concentration Control - Retest required.

k.

TP 172 Control Room Ventilation - Resolve negative pressure deficiency.

1.

TP 600 Liquid Waste Operational - Resolve test deficiencies, m.

TP 262 Gaseous Waste Operational - Resolve Pressure control deficiency.

2.

Leaky Snubber Sight Glasses (50.55(e) Item)

Complete repairs on safety-related snubbers.

3.

Puup Runout Control Resolution and implementation of a method to prevent pump runout for decay heat and reactor building spray pumps.

4.

Chemistrv Fume Hoods Face velocity is less than reco= mended by NBS Randbook 92 and the American conference of Governmental Industrial Rygienists.

_ ~.

W

~

=

,e-m-.m c