ML19319D380

From kanterella
Jump to navigation Jump to search
Forwards Status Rept Re Burnable Poison Rod Separation from Fuel Assembly & Subsequent Recovery.Also Forwards Schedule of Repts Re Final Investigative Results & Analyses to Justify Continued Operation.Further Submittal Due 780515
Date released: 11/29/2019 Download: ML19319D380


Responds to NRC 780203 Request to Review Fire Protection Program for Conformance W/Nrc Guideline, Nuclear Plant Fire Protection Functional Responsibilities,Admin Controls & Qa. Forwards Review Results
ML19319D385
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/30/1978
From: Griffin B
FLORIDA POWER CORP.
To:
Office of Nuclear Reactor Regulation
References
Download: ML19319D385 (6)
Facility Status Rept.
ML19319D382
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/01/1978
From:
FLORIDA POWER CORP.
To:
References
FOIA-79-149
Download: ML19319D382 (15)
Forwards Status Rept Re Burnable Poison Rod Separation from Fuel Assembly & Subsequent Recovery.Also Forwards Schedule of Repts Re Final Investigative Results & Analyses to Justify Continued Operation.Further Submittal Due 780515
ML19319D379
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/04/1978
From: Stewart W
FLORIDA POWER CORP.
To: NELSON C C
Office of Nuclear Reactor Regulation
References
FOIA-79-149
Download: ML19319D379 (3)