ML19319D366

From kanterella
Jump to navigation Jump to search
Confirms 770416 Notification Informing IE That Steam Driven Emergency Feedwater Pump Failed to Start on Main Feedwater Pump Loss.Primary Cooldown Rate Experienced in Excess of Tech Spec Requirements
ML19319D366
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/16/1977
From: Beatty G
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8003160201
Download: ML19319D366 (1)


Text

'e MIDDLET0nN, VA. 2260*

U2 M g

  • h

~7j mestern union B

B LA E=3

,q 2-027c30E106 Oc/16/77 ICS IPMMTZZ CSP ATLA 9047956c66 MGM TOMT CRYSTAL RIVER FL 110 04-16 0150P EST NORMAN C MOSELY DIRECTOR USNRC DEGION 2 0FFICE OF INSPECTION AND ENFORCEMENT 230 PEACMTREE ST NORTMWEST SUITE 818 ATLANTA GA 30303

/.

RE DOCKET 850-302 LICENSE DPR=72 THIS h!LL CONFIRM OUR NOTIFICATION TO MR J D MARTIN OF YOUR OFFICE AT 1230 ON 16 APRIL 1977 THAT THE STEAM ORIVEN EMERGENCY FEEDWATER PUMP FAILED TO START ON LOSS OF MAIN FEEDWATER PUMPS. MOTOR DRIVEN PUMP hAS

~,wq AVAILABLE. THIS ALSO CONFIRMS OUR NOTIFICATION TO MR MARTIN OF A PRIMARY C00LD0hN RATE EXPERINCE OF 'JPROXIMATELY 101F IN 20 MINUTES.

TMIS IS IN EXCESS OF REQUIREMENTS OF TECHNICAL SPECIFICATIONS 3.4.9.1.

OETAILED REPORT WILL FOLLOW w! THIN 2 WEEKS G P BEATTY JR NUCLEAR PLANT MANAGER CRYSTAL RIVER UNIT #3 FLORIDA P0nER CORP i

13:50 EST MGMCOMP MGM 1

i

)

.& s b

  • ni\\6 g o 031 ou'A0 I 5

~

L4

..