ML19319D295

From kanterella
Jump to navigation Jump to search
Forwards Proof & Review Tech Specs for Review Re Accuracy & Completeness.Response Date 751205.W/o Encl
ML19319D295
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/03/1975
From: Mcgough J
Office of Nuclear Reactor Regulation
To: Grier B, Reid R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
References
NUDOCS 8003130943
Download: ML19319D295 (1)


Text

..

9 N

UNITED STATES

^

. aCLEAR REGULATORY COMMISSION

" ^

^

WASHINGTON, D.

C.

20555 7

v-v p NOV 3 E75 B. Grier, Director, Division of Peactor Inspection Prcycus, OI&E TR Branch Chiefs R. W. Beid, Chief,ip rating Peactors Branch #4, EL CRYSTAL RIVER UNIT 3 Enclosed is the Proof and Review Copy of the Crystal Fiver Unit 3 Technical Specifications that are tentatively scheduled for issuance as <% M x "A" of the Operating License for this facility on or about February 15, 1976. These specifications have been ge".eratcd frcm the current P2h% and Wilcox Stardard Technical Specificaticns with minor nodifications as necessary to acwa.udate plant specific design features.

Each reviewer should ex rdne the apprcpriate secticns of this doc m t to ensure the accuracy rd ccmpleteness of the specifications. puts should be provided to L. Engle - LFR 2-3 (Ext. 7886) ard R. Ectti ore '-

STS Group (ext. 7741) by December 5,1975 in crder to allow sufficient time for resolution and incorporata.cn prior to issua.ce.

/

/

( L C~VCf i

YI T

f Joseph M. McGough STS Group Teder - Cperating Paacters Division of Reactcr Licensing Enclo.eure:

As stated cc w/ enc 1:

L. Engle R. Bottincre P. Callins - infomation only Region II, OILE - inforation only 80031307g

- - " ^

^-

,n,

-