ML19319D216

From kanterella
Jump to navigation Jump to search
Notification of 780810 Meeting W/Util & NRC in Bethesda,Md Re New Corrective Fix for Concrete Separation on Reactor Bldg Dome
ML19319D216
Person / Time
Site: Crystal River 
Issue date: 08/02/1976
From: Engle L
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8003130830
Download: ML19319D216 (2)


Text

W.p-

'}'

F

~

MEETING NOTICE DISTRIBUTION A

Docket File M K. Kniel NRC/PDR J. Knight L/PDR G. Knighton ACRS (16)

W. Kreger TIC G. Lainas OELD R. Maccary IE J. Miller OPA V. Moore SD(7)

T. Novak LWR-1 File

0. Parr NRR Reading S. Pawlicki R. Ballard W. Regan V. Benaroya D. Ross H. Berkow Z. Rosztoczy R. Boyd B. Rusche D. Bunch I. Sihweil W. Butler D. Skovholt E. Case H. Smith P. Check M. Spangler R. Clark T. Speis J. Collins C. Stepp P. Collins J. Stolz R. Denise R. Tedesco H. Denton S. Varga R. DeYoung D. Vassallo M. Ernst R. Vollmer B. Faulkenberry, IE F. Utiliams W. Gammill B. Youngblood R. Heineman Participants C. Heltemes Project Manager R. Houston Receptionist L. Hulman T. Ippolito 8003130 h

/

UNITED STATES a

c j

NUCLEAR REGULATZRY COMMISSION i

y 7~

S WASHINGTON, D. C. 20066 3

\\...../

AUG 2 1976 Docket No. 50-302 Y,,r John' F. Stolz, Chief, Light Water Reactors Branch No.1, DPM FORTHCOMING MEETING WITH FLORIDA POWER CORPORATION REGARDING A NEW CORRECTIVE FIX FOR CONCRETE SEPARATION ON THE REACTOR BUILDING DOME OF CRYSTAL RIVER, UNIT 3

. TIME & DATE:

1:30 PM - Tuesday, August 10, 1976 LOCATION:

Room P-ll8, Bethesda, Maryland PURPOSE:

Applicant and their consultants will update the NRC staff on the investigations, findings, and the new corrective fix for the concrete separation on the Crystal River, Unit 3 reactor building dome.

PARTICIPANTS:

Florida Power Corporation, et al Gilbert Associates, Incorporated, et al MPR, Incorporated, et al Construction Engineering Consultants, Incorporated, et al Massachusetts Institute of Techn:lcgy Dr. A. Holl ey North Carolina State University Dr. P. Zia Advisory Comittee on Reactor Safeguards Dr. C. Seiss Advisory Comittee on Reactor Safeguards Staff R. Muller, et al NRC Staff L. Berratan, D. Bunch, L. Engle, A. Glucknan, R. Shewnaker, I. Sihweil, J. Stolz, C. Tan, et al me w Leon Engle, Pr ect Manager Light Water Reactors Branch No.1 Division of Project Manage:1ent

.