UNITED STATES
o
ATOMIC ENERGY COMMISSION
v'I 7/_e
i
DIRECTORATE OF REGULATCRY CPERATIONS
-
REGION II - SulT E 818
s
$
)
230 P E ACHT R E E ST R E ET, NoRT HwEST
si,q, os
T,L,,,,,,
, ,,,,, ,,,,,,,,
47t,43r4;ogono,4 3o3o 3
In Reply Refer To:.
JUN
6 1973
RO:II:ER
50-302/73-4
,
'
Florida Power Corporation
'
Attn: Mr. J. T. Rodgers
Assistant Vice President -
Generation Engineering
,
I
3201 34th Street South
P. O. Box 14042
St. Petersburg, Florida
33733
'
Gentlemen:
'
This refers to the construction inspection conducted by Mr. Swan
of this office on April 24-27, 1973, of activities authorized by
AEC Construction Permit h CPPR-51 for the Crystal River 3 facility,
i
and to the discussion of our findings held by Mr. Swan with
j
Mr. H. L. Bennett and other members of your staff at the conclu-
i
sion of the inspection.
Areas examined during the inspection and our findings are discussed
in the enclosed inspection report. Within these areas, the inspec-
tion consisted of selective examinations of procedures and repre-
sentative records, interviews with personnel, and observations by
the inspector.
'
Within the scope of the inspection, no violations were identified.
In accordance with Section 2.790 of the AEC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
'
and the enclosed inspection report will be placed in the AEC's Public
-
Document Room.
If this report contains any information that you
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such informa-
tion from public disclosure. Any such application must include a
full statement of the reasons on the basis of which it is claimed
that the information is proprietary, and should be prepared so that
~
.
O
sooso40 fO
.
.
-
-
.
..
.
_
. . .
-
-
'\\
- '
,
.-
D
.
. *
Florida Power Corporation
2-
gg
-
proprietary information identified in the application is contained
in a separate part of the document.
If the report contains no infor-
mation which you believe to be proprietary, please inform us in writ-
ing within 20 days to this effect.
In such case, the report, as enclosed
with this lettar, will be placed in the Public Document Room.
'
Should you have any questions concerning this letter, you may communi-
cate directly with this office.
Very truly yours,
.
-
/ ,, '
/
f
/
/ / nnca+ L e -
f
%
.*>
,
Norman C. Moseley
Director
Enclosure:
]
Inspection Report No.
50-302/73-4