Forwards Insp Rept 50-302/73-04 on 730424-27.No Noncompliance Noted
ML19319D053
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/06/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19319D044 List:
References
NUDOCS 8003040969
Download: ML19319D053 (2)


See also: IR 05000302/1973004

Text

-___

_ - - .

___ _ _ _ .

-

_-

-

-_ _ -

_- _ _ _

O

5

.

c" ' *-

'

UNITED STATES

o

ATOMIC ENERGY COMMISSION

v'I 7/_e

i

DIRECTORATE OF REGULATCRY CPERATIONS

-

REGION II - SulT E 818

s

$

)

230 P E ACHT R E E ST R E ET, NoRT HwEST

si,q, os

T,L,,,,,,

, ,,,,, ,,,,,,,,

47t,43r4;ogono,4 3o3o 3

In Reply Refer To:.

JUN

6 1973

RO:II:ER

50-302/73-4

,

'

Florida Power Corporation

'

Attn: Mr. J. T. Rodgers

Assistant Vice President -

Generation Engineering

,

I

3201 34th Street South

P. O. Box 14042

St. Petersburg, Florida

33733

'

Gentlemen:

'

This refers to the construction inspection conducted by Mr. Swan

of this office on April 24-27, 1973, of activities authorized by

AEC Construction Permit h CPPR-51 for the Crystal River 3 facility,

i

and to the discussion of our findings held by Mr. Swan with

j

Mr. H. L. Bennett and other members of your staff at the conclu-

i

sion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspec-

tion consisted of selective examinations of procedures and repre-

sentative records, interviews with personnel, and observations by

the inspector.

'

Within the scope of the inspection, no violations were identified.

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

'

and the enclosed inspection report will be placed in the AEC's Public

-

Document Room.

If this report contains any information that you

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such informa-

tion from public disclosure. Any such application must include a

full statement of the reasons on the basis of which it is claimed

that the information is proprietary, and should be prepared so that

~

.

O

sooso40 fO

.

.

-

-

.

..

.

_

. . .

-

-

'\\

- '

,

.-

D

.

. *

Florida Power Corporation

2-

gg

-

proprietary information identified in the application is contained

in a separate part of the document.

If the report contains no infor-

mation which you believe to be proprietary, please inform us in writ-

ing within 20 days to this effect.

In such case, the report, as enclosed

with this lettar, will be placed in the Public Document Room.

'

Should you have any questions concerning this letter, you may communi-

cate directly with this office.

Very truly yours,

.

-

/ ,, '

/

f

/

/ / nnca+ L e -

f

%

.*>

,

Norman C. Moseley

Director

Enclosure:

]

Inspection Report No.

50-302/73-4