ML19319C971
| ML19319C971 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/18/1974 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19319C972 | List: |
| References | |
| NUDOCS 8003040906 | |
| Download: ML19319C971 (2) | |
See also: IR 05000302/1974007
Text
...
-
. .
.-
-
-
'
?
"
5y.
3
' . gp:;4 ;
v
UNITED STATCG
4
'
e
~
I.7j ~
ATOMIC ENERGY COMMISSION
-r q h [. j. i
g
-
4-
omE: Puts or asoutATony OPERATI0ns
.-
V ,6
P-
armon o - soin ma
gf,m$, 3.f
m nr.e .mc sr um no 1
3r
, , , , , , , , , , , , , , . , , , , , , ,
..
.
,y
A v i.. u r 4. co onc.e 4 303o s
JUN 3 81974
'
In Reply Refer To:
RO:II:EJV
l
50-302/74-7
"
.
t
Florida Power Corporation
ATTN:
Mr. J. T. Rodgers
.
Assistant Vice President -
Generation Engineering
.
3201 34th Street, South
P. O. Box 14042
<-
,
St. Petersburg, Florida
33733
Gentlemen:
.
This refers to the inspection conducted by Messrs. E. J. Vallish,
'
F. U, Bower and T. E. Conlon of this office on April 29 - May 3, 1974,
of activities authorized by AEC Construction Permit No. CPPR-51 for
the Crystal River Unit 3 facility, and to the discussion of our findings
'
Q
held by Messrs. Vallish, Bower and Conlon with Mr. E. E. Froats and
Q
others of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
i
Within the scope of this inspection, no violations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. These are identified in Section IV of the summary of the
j
enclosed report.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2',
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
]
Room.
If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office requesting that su:h information be withheld from public
disclosure.
If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
COPY Sli2tt To: PDR
I
-
LPDR
JISIC
,j- { l'y
-
n,
- .y .
j
/
..
80 304070$ @
. .-
_.
.
--
-
.-
.
.
...
.
- - - .
__
.-
-
-
.f
.
..
-N
4
i
. . .
,
-
,
.
n.
.
.
Florida Power Corporation
-2-
JUN 181974
.
s
.
submitted, it must fully identify the bases for which information is
,
claimed to be proprietary. The application should be prepared no that
information sought to be withheld is incorporated in a separate paper
,
and referenced in the application since the application will be placed
in the Public Doctment Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contacted as
,
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
,
Should you have any questions concerning this letter, we will be glad
'
to discuss then with you.
..
Very truly yours,
'
)
,
. -j
(' ? ,?/ / c w
)
- /p'rn u r
/
,.
.
,
a
,
I Norman C. Moseley
'
Director
-
,
j
Enclosure:
.
I
RO Inspection Report No.
50-302/74-7
I
i
.
l
4
I
3
I
,
l
'
l
'
!
,
1
'
1
f
l
'
.1
f
'
l
i
?
a
.
,
1
\\
a