Forwards Insp Rept 50-302/74-07 on 740429-0503.No Noncompliance Noted
ML19319C971
Person / Time
Site: Crystal River 
Issue date: 06/18/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19319C972 List:
References
NUDOCS 8003040906
Download: ML19319C971 (2)


See also: IR 05000302/1974007

Text

...

-

. .

.-

-

-

'

?

"

5y.

3

' . gp:;4 ;

v

UNITED STATCG

4

'

e

~

I.7j ~

ATOMIC ENERGY COMMISSION

-r q h [. j. i

g

-

4-

omE: Puts or asoutATony OPERATI0ns

.-

V ,6

P-

armon o - soin ma

gf,m$, 3.f

m nr.e .mc sr um no 1

3r

, , , , , , , , , , , , , , . , , , , , , ,

..

.

,y

A v i.. u r 4. co onc.e 4 303o s

JUN 3 81974

'

In Reply Refer To:

RO:II:EJV

l

50-302/74-7

"

.

t

Florida Power Corporation

ATTN:

Mr. J. T. Rodgers

.

Assistant Vice President -

Generation Engineering

.

3201 34th Street, South

P. O. Box 14042

<-

,

St. Petersburg, Florida

33733

Gentlemen:

.

This refers to the inspection conducted by Messrs. E. J. Vallish,

'

F. U, Bower and T. E. Conlon of this office on April 29 - May 3, 1974,

of activities authorized by AEC Construction Permit No. CPPR-51 for

the Crystal River Unit 3 facility, and to the discussion of our findings

'

Q

held by Messrs. Vallish, Bower and Conlon with Mr. E. E. Froats and

Q

others of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

i

Within the scope of this inspection, no violations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. These are identified in Section IV of the summary of the

j

enclosed report.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2',

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

]

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office requesting that su:h information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

COPY Sli2tt To: PDR

I

-

LPDR

JISIC

,j- { l'y

TIC

-

n,

.y .

j

/

..

80 304070$ @

. .-

_.

.

--

-

.-

.

.

...

.

- - - .

__

.-

-

-

.f

.

..

-N

4

i

. . .

,

-

,

.

n.

.

.

Florida Power Corporation

-2-

JUN 181974

.

s

.

submitted, it must fully identify the bases for which information is

,

claimed to be proprietary. The application should be prepared no that

information sought to be withheld is incorporated in a separate paper

,

and referenced in the application since the application will be placed

in the Public Doctment Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

,

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

,

Should you have any questions concerning this letter, we will be glad

'

to discuss then with you.

..

Very truly yours,

'

)

,

. -j

(' ? ,?/ / c w

)

/p'rn u r

/

,.

.

,

a

,

I Norman C. Moseley

'

Director

-

,

j

Enclosure:

.

I

RO Inspection Report No.

50-302/74-7