ML19319C949
| ML19319C949 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/15/1974 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19319C945 | List: |
| References | |
| NUDOCS 8003040888 | |
| Download: ML19319C949 (3) | |
See also: IR 05000302/1974005
Text
-
. . _ _ - _
_ _ _ . _ _ ._
~
.
C'
UNITED STATES
m
j/$7'.
A.JMIC ENERGY COMMISSION
,0
'
'~f+'
'
!
DIRECTORATE OF REGULATORY OPERATIONS
'
-
nEciou n - suit E sis
g
,
230 P E AC HT RE E ST RE ET. NORT HwEST
,
,
g
e
.p
j
4rts e
AT L AN r A. GEORGa A 30 J03
,
In Reply Refer To:
APR 151974
RO:II:EJV
-
50-302/74-5
.
.
'
Florida Power Corporation
.
ATTN: Mr. J. T. Rodgers
'
Assistant Vice President
-
Generation Engineering
3201 34th Street, South
P. O. Box 14042
"
St. Petersburg, Florida 33733
.
Gentlemen:
This refers to the inspection conducted by Mr. T. E. Conlon of this office
on March 12-15, 1974, of activities authorized by AEC Construction Permit
No. CPPR-51 for the Crystal River Unit 3 facility, and to the discussion
of our findings held by Mr. Conlon with Mr. H. L. Bennett and others of
your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of sele cive examination of procedures and representative records,
intarviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed,
We have examined actions you have taken with regard to previously reported
unresolved items. These are identified in Section IV of the summary of the
j
enclosed report.
i
l
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
.
Title 10, Code of Federal Regulations, a copy of this letter and the
I
enclosed inspection report will be placed in the AEC's Public Document
Room.
If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office requesting that such information be withheld from public
disclosure.
If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proptietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
N
D FT SENT T0: PDR
]
,
Lppa,,_,
,
c
.
ESIC
/
(
II ---~~
- . . . .
8003040 M
-.
-
,
.
-- -
.
.
f3
3
.
.
,
,.
j
'
'
Florida Power Corporation
.-2-
APR 151974
.
and referenced in the application since the application will'be placed
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contauted as
specified, the enclosed report and this letter may then be placed in the
.
Public Document Room.
-
Should you have any questions concerning this letter, we will be glad
'
to dis >uss them with you.
'
Very truly yours,
'
/
'
.s
',.
.
- / f,wG.. C ~ <)l esc 6,
.,
.-
m-
.
,/
Norman C. Moseley
Director
Enclosure:
RO Inspection Report No.
i
50-302/74-5
I
,
<
1
e
O
_ _ _ _ _ .
.
.
-
-.
. - - . - - - -
- _ _-
. _ - _ _
- _ _ ._-
---
_-
.. - - _ _ _
.
..
.
e
}
~
f '~
s
.
.
,
.
,
.
.
Letter to Florida Power Corporation from N. C. Moseley
-dated
APR 151974
50-302/74-5
.
.
-
DISTRIBUTION:
H. D. Thornburg, RO
-
RO:HQ (4)
gDirectorate of Licensing (4)
,
DR Central Files
.
.
cc enc 1. o:ly:
'
- PDR
- Local PDR
- NSIC
- DTIE, OR
' '
- State
,
- To be dispatched at a later date.
-
.
i
e
.
.
.
4
.
0
,,
_ . , ,
. , .
..e
. , - , . . -
, - ,
-
-
- .-
-- . , -
., , , - , , . . - , - , , . - . , - , . . , , ,
.,,--,--.-,------rn
-,.n----,