Forwards Insp Rept 50-302/74-14 on 741010-11.No Noncompliance Noted
ML19319C833
Person / Time
Site: Crystal River 
Issue date: 11/05/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19319C827 List:
References
NUDOCS 8003040795
Download: ML19319C833 (3)


See also: IR 05000302/1974014

Text

_ _ _ _ _ _ _ _ _ _ - _ _ .-

Q'

/sdr

,

..

..

N

.

Letter to Florida Power Corporation from N. C. Moseley

dated

NOV 5

1974

and RO Rpt. No. 50-302/74-14

.

.

.

DISTRIBUTION:

H. D. Thornburg, RO

RO:HQ (5) '

N

'

DR Central Files

Regulatory Standards

-

Directorate of Licensing (13)

  • PDR

-

,

6

  • NSIC

-

  • State
  • To be dispatched at a later date.

,

.

l

i

'

.

80.os oa n p 7r

l

1 ^

l

l

,.

,

_

--_

.-

-,. , - . .

- - . . - _

' '"

' ~

UNITED STATES

~

'

'

ATOMIC ENERGY COMMISSION

,

l*

-

DIRECTORATE OF REGULATORY OPERATIONS

) -l

REGloN il - SulT E 818

230 PE ACHT REE ST REET. NoRT HwEST

T a ta rmout: 4404ssae.asos

/

AT L. A NT A. GEoRGt A 30303

4 7, $ #

,

In Reply Refer To:

,

RO:II:EJV

50-302/74-14

.

7

Florida Power Corporation

ATTN:

Mr. J. T. Rogers, Assistant

.

Vice President, Quality and

Environmental Departments

320134th Street, South

e

s

P. O. Box 14042

-

St. Petersburg, Florida 33733

Gentlemen:

.

This refers to the inspection conducted by Messrs. E. J. Vallish and

W. B. Swan of this office on October 10-11, 1974, of activities authorized

by AEC Construction Permit No. CPPR-51 for the Crystal River Unit 3 facility,

and to the discuss 1on of our findings held by Messrs. Vallish and Swan with

~'N

Messrs. Jackson and Slater at the conclusion of the inspection.

)

/

s

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were disclosed.

We have examined actions you have taken witb regard to previously reported

unresolved items. These are identified in Section IV of the summary of the

enclosed report.

Two new unresolved items resulted from this inspection and are identified in

Section III of the summary of the enclosed report. These items will be

examined during subsequent inspections.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

,s

\\_))

/

submitted, it must fully identify the bases for which information is

i

.

_.

..

_ _ - .

.-

7

__

-)

s

NOV 5

19N

g.

.

Florida Power Corporation

-2-

.

claimed to be proprietary. The application should be prepared so that *

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

-

in the Public Document Room. Your application, or written statement,-

should be submitted to us within 20 days. If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

-

,

Public Document Room.

Should you have. any questions concerning this letter, we will be glad to

'

~

discuss them with you.

.

'

Very truly yours,

,,

J

.-

, V

'

-

Norman C. Moseley

-

Director

Enclosure:

O

RO Inspection Report No.

50-302/74-14

,