ML19319C814
| ML19319C814 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/10/1969 |
| From: | Seidle W US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319C815 | List: |
| References | |
| NUDOCS 8003040781 | |
| Download: ML19319C814 (2) | |
Text
.
.o
-\\
~
)
'9
[
[f UNITED STATES ATOMIC ENERGY COMMISSION Vl
.l l
DIVISION OF CoMPl. LANCE e
REGION 11 - SUITE 818 230 PEACHTREE STREET. N OR T H W EST Tma S26-453 7 AT LANT A. GEORGI A-30303
~\\
October 10, 1969 J. P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch Division of Compliance, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER UNIT 3), LICENSE NO. CPPR-51, DOCKET NO. 50-302 The attached report of an inspection of the subject facility by our insp- %r on September 24-25, 1969, is forwarded for information. No ite-
- conformance were detected.
'tector on this visit for the primary purpose of N agement personnel associated with construction s
\\
continues. Approximately 12,000 cubic n/
d'o
, rout must be placed before work on the con-f0,.
gin. Construction is running about eight to
,^
1 '.
W le according to H. L. Bennett, FPC, Manager, V
- /
/6 s
\\
W. C. Seidle Senior [ Reactor Inspector
\\
~'
l-70-302/69-5 b/fsc'u.el C1'id/d
- m. u. case, DRS R. S. Boyd, DRL (2)
-M S. Levine, DRL (6)
.' W D. J. Skovholt, DRL (3)
/jp L. Kornblith, Jr., CO
'x m R. W. Kirkman, CO:I
'/. */ /
/
B. H. Grier, CO:III D. I. Walker, CO:IV R. W. Smith, CO:V v
REG Files 9 7322 p:i.
800304o7pj g
. (
DIVISION OF EGIPLIANCE MONTHLY REPORT, OCTOBER 1969
-Q
- 2j3
?s*? c0,Q' 1 l
~
Florida Power Corporation (Crystal River Unit 3) - An inspection 1
was conducted on Septemb_er_2#--25_.
Work on the reactor foundation is continuing. Anticipated labor problems at the site could result in significant schedule delays.