Forwards Insp Rept 50-302/69-04 on 690729-30.No Noncompliance Noted
ML19319C804
Person / Time
Site: Crystal River 
Issue date: 08/21/1969
From: Seidle W
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C805 List:
References
NUDOCS 8003040774
Download: ML19319C804 (1)


Text

_ _ _ _ _ - - _.

,)

m UNITED STATES ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE Region II - Suite 818 230 Peachtree Street, Northwest Telephone:

526-4537 Atlanta, Georgia 30303 August 21,.1969 J. P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch Division of Compliance, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER UNIT 3) LICENSE NO. CPPR-51, DOCKET NO. 50-302 The attached report of an inspection of the subject facility by our inspectors on July 29-30, 1969, is forwarded for infomation. No items of noncon#ormance were noted.

The site construction work is still being limited to site preparation activities which, at present, involve dewatering operations, excavation and consolidation grouting.

Our inspectors have made an in-depth review of the site sub-structure.

p) g Although the size of some fissures is somewliat alaming, we feel that k'

the grouting and backfill operations will provide a sound structure.

The licensee has advised us that there will be a nine month delay in the delivery of the B&W reactor pressure vessel, but that this should not delay the reactor completion achedule more than four months.

/dle 7

?@'?CO:II:WCS f

W. C. Se

/

Senior Reactor Inspector W:t

Enclosure:

g'g'- CO Report No. 50-302/69-4 (Bryant, Swan) cc:

E. G. Case, DRS R. S. Boyd, DRL (2)

S. Levine, DRL (6) yf g 3...

- >a D. J. Skovholt, DRL (3)

% WGJ A!;' i..i....m

.A c

L. Kornblith, Jr., C0 R. W. Kirlcnan, 00:I B. H. Grier, C0:III 92 tr [jj S3 Ofif GG D. I. Walker, 00:IV fq R. W. Smith, 00:V

/

RFD Files 03M3333

\\d l

g

.c,: q 3 8048o4o77y 9