ML19319C774
| ML19319C774 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Crystal River, Zion |
| Issue date: | 04/22/1971 |
| From: | Vetter W US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Henderson J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319C775 | List: |
| References | |
| NUDOCS 8003040736 | |
| Download: ML19319C774 (1) | |
Text
O e
on c,
_o o
[
UNITED STATES
]. i. @N w.
l ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE 4
REGION Ill itsng e 799 ROOSEVELT ROAD TELEPHONE GLEN ELLYN. ILLINOls 60137 (siz) ass zseo April 22,1971 James B. Henderson, Chief, Reactor Construction Branch Division of Compliance,11eadquarters VENDOR INSPECIION REPOIT - BABC0CK & UILCOX COMPANY, Ifr. VERNON, INDIldIA ZION 1, OCONEE 3, AND CRYSTAL RIVER 3 DOCIET NOS. 50-295, 50-287, AND 50-302 The attached repo.t of a vendor inspection at the subject plant on March 30 through April 2,1971, is transmitted for information.
During the inspection, our inspector encountered two apparent ite s of code nonconfor:r.ance. One ite:2 involves failure to maintain accurate heat treat data as required by ASI2 Section III, and the other involves the use of penetranaters in a canner inconsistent 1
p with ASHE Section III. A CDN covering these itens is currently being processed for issuance to the Duke Pover Cor.pany.
l Section II.E. of the attached report contains information reintive j
to the status of P2V veld inspection using UT techniques.
W. E. Vetter Senior Reactor Inspector Attachments:
1.
Babcock & Wilcox Rpt No. 71/1 by R. E. Oller (19 mats) 2.
Inspector's Evaluation Memo 4
O
%/
PocoyoP.N
-