ML19319C774

From kanterella
Jump to navigation Jump to search
Forwards Vendor Insp Rept B&W 71-01 on 710330-0402 & Re Oller 710420 Evaluation Memo.Noncompliance Noted
ML19319C774
Person / Time
Site: Oconee, Crystal River, Zion  Duke Energy icon.png
Issue date: 04/22/1971
From: Vetter W
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C775 List:
References
NUDOCS 8003040736
Download: ML19319C774 (1)


Text

O e

on c,

_o o

[

UNITED STATES

]. i. @N w.

l ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE 4

REGION Ill itsng e 799 ROOSEVELT ROAD TELEPHONE GLEN ELLYN. ILLINOls 60137 (siz) ass zseo April 22,1971 James B. Henderson, Chief, Reactor Construction Branch Division of Compliance,11eadquarters VENDOR INSPECIION REPOIT - BABC0CK & UILCOX COMPANY, Ifr. VERNON, INDIldIA ZION 1, OCONEE 3, AND CRYSTAL RIVER 3 DOCIET NOS. 50-295, 50-287, AND 50-302 The attached repo.t of a vendor inspection at the subject plant on March 30 through April 2,1971, is transmitted for information.

During the inspection, our inspector encountered two apparent ite s of code nonconfor:r.ance. One ite:2 involves failure to maintain accurate heat treat data as required by ASI2 Section III, and the other involves the use of penetranaters in a canner inconsistent 1

p with ASHE Section III. A CDN covering these itens is currently being processed for issuance to the Duke Pover Cor.pany.

l Section II.E. of the attached report contains information reintive j

to the status of P2V veld inspection using UT techniques.

W. E. Vetter Senior Reactor Inspector Attachments:

1.

Babcock & Wilcox Rpt No. 71/1 by R. E. Oller (19 mats) 2.

Inspector's Evaluation Memo 4

O

%/

PocoyoP.N

-