ML19319C710

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/75-03 on 750212-14.No Noncompliance Noted
ML19319C710
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/07/1975
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19319C711 List:
References
NUDOCS 8003030829
Download: ML19319C710 (2)


See also: IR 05000302/1975003

Text

- - - _ - _ _ - - _ _ - - _ _ _ _

.

-

-

-

~

"

UNITED STATES

NUCLEAR REGULATORY COMMISSION

C)g

nimien it

230 PEACHTREE STREET, N. W.

SUITE SIS

ATLANT A. GEO RGI A 30303

.

In Reply Refer To:

gg 7

g5

,

IE:II:EJV

50-302/75-3

.

.

t

Florida Power Corporation

ATTN:

Mr. J. T. Rodgers

.

Assistant Vice President

Quality and Environmental

COPY SI2iT IO: PDR '

-

/

Departments

LPDR /

'

320134th Street, South

NSIC

P. O. Box 14042

TIC

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Messrs. E. J. Vallish, and

S. D. Ebneter of this office on February 12-14, 1975, of activities

authorized by NRC Construction Permit No. CPPR-51 for the Crystal River

O-

Unit 3 facility, and to the discussion of our findings held by

Messrs. Vallish and Ebneter with Mr. H. L. Bennett, and others of your

staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

. the enclosed inspection report. Within these areas, the inspection

consisted of sr.lective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

.

.

Two new unresolved items resulted from this inspection and are identified

-

in Section III of the summary of the enclosed report.

These items will

be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you believe to be

proprietary, it ~is necessary that you submit a written application to

this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application ic

l

m

owTro,

g

%, .)

80030so },zy 9

~

.

.

- .-

.

--

'

.

.

,

-

,*m,

.

n

NAR 7

707 :

Florida Power Corporation

-2 -

,

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

l

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

-

,

j

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

'

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

.

,

Should you have any questions concerning this letter, we will be glad to

j

discuss them with you. -

Very truly yours,

,h

([E ~ ')f

i c'l

'

,

_.

Norman C. Moseley

5

.

Director

b

Enclosure:

(

IE Inspection Report No.

50-302/75-3

i

O

,

i

,

-

-

-

.

. -

-

-

. ...

- .-