ML19319C490

From kanterella
Jump to navigation Jump to search
Forwards Revised Hydrologic Engineering Summary Input for Ser.Issue Re Max Calculated Temps for Ultimate Heat Sink Resolved
ML19319C490
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/19/1975
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Moore V
Office of Nuclear Reactor Regulation
Shared Package
ML19319C498 List:
References
NUDOCS 8002190936
Download: ML19319C490 (1)


Text

_

4 SEP 1318Z5 Voss A. Moore, Assistant Director for Light Water Reactors, Group 2, RL REVISED HYDROLOGIC ENGINEERING

SUMMARY

PLANT NAME: Davis-Besse 1 LICENSING STAGE:

CL.

DOCKET NUMBER: 50-i34V MILESTONE NUMBER:~~24-32 RESPONSIBLE 3 RANCH: LWR 2-3 REVIEW STATUS: Hydrologic Engineering Section, SAB - Completo Enclosed is a Ravisad Hydrologic Engineering S'1::ssary, prepared by G. 3. Staloy and D. L. Schreiber. The revisions have been added to a copy of the originni su= nary and are underlined on the enclosura.

Our original SER su:=sary, transmitted by letter dated August 1,1975, had an unresolved issue pertaining to the m.txi=u:n calculated tenpera-tures for the Ultinata Meat Sink. We have resolved this issue as described in the enclosed revisions.

,,w,

.a.;

it it Etr.v.

Harold R. Denton, Aasistant Director for Site Safety Division of Technical Review Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION:

DOCKET FILE cc w/o encl:

NRR RDG 1

R. Boyd SAB RDG c b. 9 W. Mcdonald J. Panzarella j.

ce v/ enc 1:

/

S. Hanauer R. Klecker R. Heineman D. Eisenhut H. Denton S. Varga D. Crutchfield M. W1Himme SS Branch Chiefs V. Benaroya A. Schwencer J. Collins L. Engla J. Fairobent G. Staley L. G. His1mmn

-4 TR:SABM._ TR:SAB TR g TR:g TR:Aj/48 o rrec a,.

)

CBStaley:ms DLSchreiber LN WPC

.l. _ _ _ HRD Qu_

e.....

_9L16/75 9/17I75

?}.L7l_75

. 91/ 7115 '

..91) 115 oar.

Form AEC 318 (Rev. 9 53) ARCM 02eo Tr.. e. oovenmusar ramtiae oprics sen.sse see 8 0 02190 93g' f