Submits Proposed Addition to App a Tech Spec 3.4.1.Ability to Transfer Operation from One Decay Heat Removal Train to Another Is Necessary to Complete Several Testing Program Requirements
ML19319C182
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/20/1977
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
281, NUDOCS 8001310536
Download: ML19319C182 (2)


Text

'

NRC p;RM 195 u.s.NuCLEAa r.EcutAT cy commission

^

~

Doc ET NUMh8h'

}

sj (2 10)

NRC DISTRIBUTION pcR rxRT 50 DOCKET MATERIAL FROM: Toledo Edison DATE OF DOCUMENT TL. Mr. John F. Stolz Toledo, Ohio 43652 05-20-77 Lowell E. Roe DATE RECEIVED 05-27-77 ER ONOTORIZE D PROP INPUT PORM NUMBE CQPIES RECEIVE

)

RIGIN AL pgC LASSIFIE D

.l

[

4 CICPY F

\\

ENcLOSU RE DESCRIPTION j

Furnishing Change of Tech Specs to i

Facility Operating License No NPF-3 condition 2C ('3 ) (j )

j Appendix "A" consisting of transfering operation from one detay heat removal train to the other which is necessary to complete several testing program requirements...

t

~

,. *f 1 page r,.

PLANT NAME*

DAVIS BESSE JCM l

l SAFETY FOR ACTION /INFORMATION evtTTun

~

4

/ ASSIGNED AD:

Assteven an.

i I

BRANCH CHTEFr

/ / d C '$d3 2 l_.O RRANCH-cMTTU.

/[ PROJECT FANAGER:

C+hl 7 PROJECT MANAGER:

I 1

/ LIC. ASST. :

7f4,pffA LIC. ASST. :

N. O4 ~hM1 l

7m INTERNAL DISTRIBUTION

  1. "C""'

SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &

/ NRC PDR, HEINEMAN

/

TEDESCO ENVTRO ANALYSTS

/I & E / d2 /

SCHROEDER h BENAROYA DENTON & vi'T T ??

/ OELD V I

' / T.ATus GOSSICK & STAFF ENGINEERING

/

IPPOLITO ENVIRO TTCH.

MIPC MACARRY KIR11*00D ERNST CASE

[

B03UAK BALLARD HANAUER

/ _ SIHNEIL OPERATING REACTORS SPANGLER HARLESS

/

PAWLICKI STELLO SITE TECH..

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

/ CAMMILL( 2. I BOYD

/

ROSS EISENHUT STEPP

'/

P, COLLINS

/ NOVAK SHA0 HULMAN I

H0_USTON

/l ROSZTOCZY BAER PETERSON

/

CHECK BUTLER

. SITE ANALYSIS MELTZ CRIMES 6 V OLLF.E R HELTEMES AT & I

// BUNCH l

SKOVHOLT SALTZMAN

/J. COLLINS

/

KRECER RUTBERG

, EXTERNAL DISTRIBUTION CONTROL NUMBER

[L_PDR M fj L f n t D wi C/h NAT. LAB:

BEQQKilAVEN NAT. TM _

3' I

REC V.IE ULRIKSON (ORNL) l lIC.,:

NSIC:

LA PDR ASLB_:

CONSULTANTS:

ACRS/6 CYS -HetsfelG/SEBT M l' ( M /-/

7.,,

o NRCFERM 196 12 768 g

,$p=) 6 r--

~

8001310

'N TOLEDO W

EDISON Docket No. 50-346 N* '

LOWELL E. ROE May 20, 1977 y

y,,,,,,,,,,

t '*

MAY271977#

'""*" ~~~"'

5

S' 258 58'8 Serial No. 281 v.s. gagtytcu mi s rm S

q, fa Q Cy.'

~

Director of Nuclear Reactor Regu Attn:

Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Division of Project Management United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stolz:

Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3 condition 2C(3)(j), together with Appenix "A" Technical Specification 3.4.1 item a. of Action : Modes 3, 4, and 5 imposes an operating restriction preventing the completion of our preoperational test program. The identified conditions preclude our ability to transfer operation from one decay heat removal train to the other which is necessary to complete several testing program requirements.

The following additional statement to the above-referenced item a.

has been suggested by your Project Licensing Manager, and is acceptable to our purposes:

All reactor coolant pumps and decay heat removal train pumps may be de-energized for up to one hour to accommodate decay heat removal pump switching operations, provided no operations are permitted which could cause dilution of reactor coolant system boron concentration.

May we have your prompt acknowledgcent of this Technical Specification change so that this portion of our test program may continue.

Yours very truly LER/naf THE TCLEDO EDISCN CCMPANY EDISCN PLAZA 300 MADISON AVENUE TOLEDO. CHIO 43652